Gypsum powder production line adopts boiling furnace, high-voltage electrostatic dust removing and other advanced equipment, it



gypsum powder production line capacity list :
|
Capacity/T |
/ Ton/hour |
/ Raw gypsumrock consumption T/year |
Heat supplying way |
Boiling furnace size |
|
20,000 |
2.7 |
24,000 |
Heat conductive oil or steam
|
4.5M×1.0M×1.2M |
|
30,000 |
4.2 |
36,000 |
4.5M×1.2M×1.4M |
|
|
50,000 |
6.9 |
60,000 |
4.5M×1.4M×1.6M |
|
|
60,000 |
8.3 |
72,000 |
4.5M×1.6M×1.8M |
|
|
80,000 |
11.11 |
96,000 |
4.5M×1.8M×2.0M |
|
|
100,000 |
13.88 |
120,000 |
4.5 M×2.0 M×2.2 M |
|
|
150,000 |
20.83 |
180,000 |
4.5 M×2.2 M×2.4 M |
|
|
200,000 |
27.77 |
240,000 |
4.5 M×2.4 M×2.6 M |
|
|
300,000 |
41.66 |
360,000 |
4.5 M×2.6 M×2.8 M |
Brief Introduction
Natural gypsum generally includes dehydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dehydrate gypsum.
Main Technology
gypsum mine ->first breaking ->second breaking ->grinding ->calcining ->aging ->finished products (CaSO4.1/2H2O)
Raw Materials
Content of CaSO4.2H2O in gypsum mine 80%
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum
If you have more questions about the gypsum powder production line,feel free to contact me.