Share on:
This DP-MIX360 two components coating machine can be spraying two different materials at the same time and adjusted in the range of 1:1 to 10:1
Technical Data:
Mixing ratio: from 1:1 to 10:1
Tolerance: 5% more or less
Pressure ratio: 46:1 65:1 75:1
Range of viscosity: 200-20000cps (with heating system)
Max. Discharge pressure: 270bar / 380bar / 450bar
Flow rate per cycle: 0.18L, 0.29L, 0.36L
Max. Output volume: 14.5L/min, 10L/min, 5L/min
Air compressor pressure range: 3.5-6kgs
Air comsumption: 500-1600L/min
Working temperature: 0-50 C degree
Weight of the equipment: about 300kgs
100% Solid Supported
Mixing gun attached
The special designed mixing gun will mix the 2 components outside the nozzle. It will make sure the 2 components coul
-d be mixed and dried quickly at the correct ratio
Two components spraying with accurate mixing system
Ideal for shipyard, oil pipes, tanks, chemical, bridge, high way, etc. High viscosity / high solid two components spraying, like
the heavy duty epoxy asphalt / bitumen undercoating -Urethanes, Adhesives and glues -Sealants, PVC and other sealing materials, in medium to high viscosity.
Tags: two components sprayer equipment with mixing ratio adjustable.
Q1:HOW LONG CAN I GET THE FEEDBACKS AFTER WE SENT THE INQUIRY?
Your inquiries will be replied within 1 working day.
Q2: WHAT’S THE PAYMENT TERM?
Sample order, 100% before shipment. Formal order, 30% deposit before production and 70% balance against copy of BL. Normally by T/T.
L/C at sight, Paypal, West Union is acceptable depends on the amount.
Q3:WHAT IS YOUR DELIVERY TIME?
Normally 7 days for the sample order, 25~35 days for the formal orders.
Q4:WHAT IS YOUR WARRANTY TERM?
1 Year warranty for main components(Easy damaged parts are not included.)
Q5:CAN I USE MY OWN LOGO AND DESIGN ON PRODUCTS?
OEM is available. The delivery time will be 35-50 days depend on order quantity and the MOQ will be different based on different models.
Q6: CAN I CHECK THE QUALITY OF GOODS BEFORE DELIVERY?
A:You can come to our factory or ask colleagues from your Chinese office or a third party inspection company to check the quality of goods before delivery.
B:We also can provide inspection report to you before shipping