Share on (60101506196):
JL-SF03 aluminum scaffolding
1) can be folded
2) Does not occupy a space
3)the height:7 meter
4)meterial:aluminum
JL-SF03 builder scaffolding
open size:1.65x0.73x7.5m
wood size:120x40x1.2cm
round tube:45mm
N.W:17kgs

Production Time:
1.Sample Lead Time:within one week;
2.Mass Production Time:40days after receiving 30% TT or opened L/C;
Trade Terms:
1.Payment Terms:30% TT in advance,balance against the copy of B/L;L/C;
2.MOQ:500pcs;
3.The color box packing is based on more than 1000pcs,lower than this quantity will add extra cost.
4.Supply Ability:10000pcs/month;
New products from manufacturers at wholesale prices