Share on (60127995285):
2023 Full Automatic Bottled Drinking Water Production Line / Filler / Machine
Detail Product Description
(1) This water filling machine is mainly used for washing, filling and capping PET bottle which can fill non- carbonated drinks such as mineral water, pure water and so on.
(2) Bottle washing, filling and capping are achieved in one machine.
(3) The contact time is shorten between material and the outside. And improved the health conditions, production capacity and economic benefits.
(4) CGF series bottling machine adopts hanging type conveying-bottle structure to make changing bottle mold more convenient, faster and more laborsaving.
(5) The main machine adopts advanced PLC control technology. The key electric elements adopt Mitsubishi, Omron, Siemens, etc international famous products.
Detail Images Show

Washing part
l
Filling part

Capping part

The feature: the neck of the bottle was stuck between the bottle clipping board and upper formed plate, then the star wheel transmission let the machine run, and bottles were transported. So that to achieve the three process(washing, filling, sealing).
The advantages: low wear rate of bottle, easy changing of bottle model, precise and smooth driving, scientific process flow, etc.
Detail Technique Parameter
Model | CGF40-40-12 | CGF50-50-12 | CGF60-60-15 | CGF80-80-20 |
The number of Washing,Filling,Capping | 40-40-12 | 50-50-12 | 60-60-15 | 80-80-20 |
Producing capacity:The number of bottle(600ml)/hour | 16000-20000 | 20000-24000 | 25000-30000 | 35000-40000 |
Applicable bottle specifications(mm) | ψ=50-110 H=170 330ml-2250ml | |||
Pressure(kg/cm²) | 2-3 | |||
Motor power(kw) | 7.5 | 11 | 15 | 19 |
Overall dimension(mm)(L*W*H) | 4600*2800*2900 | 5450*3300*2900 | 6500*4500*2900 | 76800*66400*2850 |
Weight(kg) | 8500 | 9800 | 12800 | 15000 |

Q:Are you a manufacturer or trade company?
A:We are a manufacturer in beverage machine field more than 15 years, located at Leyu town,zhangjiagang,2 hours from Shanghai,1 hour from Wuxi by car. We will pick you up to visit our factory.
Q:Do you have any certification?
A:SGS,ISO,CE
Q:What about the delivery time?
A:Usually 40 Working days
Q:What about the machine’s capacity?
A:2000-20000 bottles in 500ml per hour.
Q:The after-sale service
A:24 months warranty.
solve basic questions by telephone, email, whatsapp, wechat and video call.
Engineer will go to buyer's factory to install, test machines, and train buyer's staff how to operate, maintain machines.
Operating manuals will be sent with machine or by email.
We also have overseas service center
Q:If our bottle size changes, can we just do some adjustment on machine according to our new bottle?
A:Yes.
Q: If I want to buy a machine, what information do I need to tell you, do you need from me?
A:a. What kind beverage you want to produce?
b. bottle volume? 250ml, 330ml, 500ml, 750ml, etc.?
c. Producing capacity requirement? How many bottles per hour?
d.Raw water analysis report .
e.Voltage and altitude.
Q:What kinds of product you supply?
A: Drink water/juice/carbonated drink filling line.
5 gallon/20L/ can beverage/glass bottle beverage filling line
Water treatment system.
Bottle blowing making machine.
After packing system(label machine, PE film shrink packing machine, carton machine)
New products from manufacturers at wholesale prices