Bitumen joint sealant highway repairing

Share on (60133537099):


Price:

Quantity:


Product Overview

Description


 


 



Product Description


 




 


 


Features:


  


1. Strong adhesion;   


2. High flexibility and durability;   


3. Good high temperature stability and low temperature resistance to brittle fracture, the tensile properties;   


4. High resistance to water loss and aging.   


5. Environmentally friendly, can effectively extend the maintenance cycle, reduce the maintenance number of times


 


 


 


pouring.jpg


6


 


 


Mode


 


 


 


 


index crack filler.jpg


 


 


 


  


 


Application: 


 


Asphalt pavement   


Concrete pavement   


Bridges and parking Treatment crack   


Cracks on the waterproof construction  


 


 


 


 


 


pouring process.jpg


 


 


 


  


 


 


 


1.  Preparation 


 


 


 


(1) determine the slot size   


The slot size is based on the local pavement temperature and the road grade. Generally ,the width don’t exceed 38mm, depth of the groove should not exceed 25mm. The both sides of grooving should remove at least 3mm and should produce vertical, intact surfaces with no loosely bonded aggregate. 


 


 


 


(2) Calculate the amount of material   


According to the empirical formula, can use following formula :   


Estimation method: width (cm) * depth (cm) * Length (m) * 0.12 (kg)  


E.g.  a slot pavement : 2cm(width) *2cm(depth)*10m(length ), then crack and joint sealants amount is: 2 *2 *10 * 0.12 = 4.8 kg


 


  


 


  


2. Grooving  


 


Step one : design the slot size ;   


Step two :adjust to grooving machine ;   


Step three : construction


 


 


 


   


3. Clearing  


 


For appropriate adhesion , cracks must be cleaned and dried before pouring. After grooving or cleaning impurities, and then use high pressure ,oil free ,dry compressed air at 90psi (620kpa )minimum ,to remove any remaining dust .


 


 


 


  


4. Preheating  


 


It must preheat groove when the temperature is below 4°C.What we done just ensure the temperature above 10°C.


 


 


 


  


5. Pouring  


 


Putting the crack and joint sealants into groove when the temperature reaches 185°C. It needs pouring several times until the cracks filled.


 


 


 


  


6. Maintenance  


 


Clearing the site after the Crack and Joint Sealants Sufficient cooling(about 15-25min).  


it must be sprayed a layer of sand or powder If you need to open the traffic immediately.


 


 


 


pouring glue xianchang.jpg


  


Storage:


 


  


 


1. This product is non-toxic, non-dangerous goods, according to general chemical building materials transport.   


2. The transit shall not exposure, rain, upside down or damaged packaging.   


3. The product shelf life is three years (room temperature, airtight and dry storage).


 


 


 


Package:


 


  


 


1399359638913_hz-fileserver-upload-17_342204


 


  


 


 



Company Information


Introduction


 


Shanghai Roadphalt Asphalt Technology Co., Ltd. is involved in developing and marketing new technology, new materials and new techniques of road pavement. Integrating scientific research, manufacturing and sales, we are a nation-level high-tech enterprise with “new material for road pavement” as our core competence. Our company owns research labs, a large-scale manufacturing and processing plant and a nationwide sales network.




 


My company seeks partners for the international market.we will provide product technical support for you.we sincerely invite you to join us for the future comfort and safety of the road. 


 


We are provide professional service for every buyers. Whatever your pouring glue needs, we have the materials and expertise to get the job done. if you have any question ,pls contact us  with no hesitate,we would like to give you more information about our products , we are here......just for you


0.1922 s.