1) The SLK-WD series gold bucket chain dredger are designed according to clients specific mining conditions and requirements.
2) Dredging depth could be min 5 meters and max 30 meters.
3) Processing capacity could be 50tph-400tph.
4) The chain bucket system digs the materials from river/sea bottom, convey it up and feed into the trommel.
5) Double sieve trommel screen with NSK bearings and high pressure water spray pipes on both sides for washing, screening and separating.
6) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%).
7) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc.
8) Powering system with Cummins diesel generator with all batteries, cables and wires.
9) Gold refinery plant to make final product of gold bars.
10) Easy for installation, operation and maintaining.
11) One-Sop gold mining solutions from A to Z.
SPECIFICATIONS OF SINOLINKING Gravity Offer Customized Gold Mining Dredge with Widely Used Rotary Screen | ||||||
Model | WD100 | WD200 | WD300 | |||
Parameters | ||||||
Dredging depth | 5-30 meters | 5-30 meters | 5-30 meters | |||
Capacity | 100 tph | 200 tph | 300 tph | |||
Power | 150 kw | 200 kw | 300 kw | |||
Bucket size/ cubic | 0.04 | 0.08 | 0.12 | |||
Clay Scrubber /mm | φ1000*2000 | φ1200*3000 | φ1500*3000 | |||
Trommel Screen /mm | φ1200*3000 | φ1500*3500 | φ1800*4000 | |||
Sluice Box | 2 sets | 4 sets | 6 sets | |||
Water Supply /m³ | 120 m³ | 240 m³ | 370 m³ | |||
Concentrators | 1 | 2 | 4 | |||
Recovery Rate | 98% | 98% | 98% | |||




Packaging of SINOLINKING Gravity Offer Customized Gold Mining Dredge with Widely Used Rotary Screen | ||
Container type | 20'GP, 40'HQ | |
Container qty | 1-6 pcs | |
Delivery time | 10-30 days | |
Price items | EXW, FOB, CIF | |
Spare parts | Free spare parts avaiable | |
1: How long takes for installation ? -Normally within 7-10 days if everything is ready. 2: What are the oversea service charge ? -Airline tickets, visa fees and salary | ||

1. 15 Years factory
2. Exported to 35 countries
3. Over 300 projects worldwide
4. All customized design
5. Ensure highest recovery rate of gold
6. Short delivery time
7. Easy to install, operate and maintain
8. Super durable heavy duty machine
9. One-stop mining solution
10. Turn-key operations
1. Are you factory?
Yes, established in 2002, over 15 years factory
2. How big are you?
In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers
3. What equipment do you build?
Specialized in alluvial/placer gold/diamond mining equipment
4. Whats the capacity of the gold/diamond mining equipment
from 5TPH to 450TPH
5. What brand engine/diesel generator do you use?
Cummins, Weichai, Yuchai, etc, or as required


91.8% Response Rate
91.8% Response Rate
91.8% Response Rate
New products from manufacturers at wholesale prices