cheap decorative fence panels/ concrete fence molds for sale/ mold for concrete panel
Precast concrete fence machine is working on a cement platform, it uses prestressed reinforcement as
guidance in advance, through the power of the reducer drive the connecting rod for reciprocatingmotion, by
the pushing plate pushed freefall concrete material into the mold, combined with the upper vibrator vibration
force, extrusion molding, at the same time using the reaction of pushing plate, make the machine to overcome
the friction from contact with the ground and the friction of the product




Model | Dimension(mm) | Power(kw) | Voltage(v) | Speed(m/h) | Weight(t) | Pcs |
80*100*4 | 2100*900*900 | 5.1 | 380 | 65-70m/h | 1.2 t | 4 |
80*120*4 | 2100*850*850 | 5.5 | 380 | 65-70m/h | 1.5 t | 4 |
100*100*4 | 2100*900*850 | 5.5 | 380 | 65-70m/h | 1.5 t | 4 |
120*120*4 | 2100*950*900 | 5.7 | 380 | 65-70m/h | 2 t | 4 |
180*200*2 (H Beam) | 2250*850*850 | 5.5 | 380 | 65-70m/h | 2 t | 2 |
200*240*2 (H Beam) | 2250*900*900 | 5.5 | 380 | 65-70m/h | 2.5 t | 2 |





Ningjin County Shuangli Building Materials Machinery Factory was founded in 2005.The factory is located at the west of Ningjin County, on the 324 provincial highway.
We have strong technical force and excellent workmanship.We specialize in the production of precast prestressed concrete molding machine. The factory runs through a strict management system with improved detection methods and perfect quality assurance system. With the increasing effort on R&D
We have successfully developed more than 100 models of precast molding machines, including Concrete hollow cored slab making machine, concrete lintel machine, concrete purline machine, concrete column making machine, lightweight wall panel machine, and concrete pipe making machine, etc.
1.Is your precast concrete fence posts concrete fence machine certificated?
----Of course, we are rewarded by "Utility Model Patent Certificate" and all our machines are in line with the national standards.
2.How many days for the prepare of the concrete fence panels?
----5 hours
3.Dowe need the wheel load to load the materials to the mixer?
----Not necesseryly. In the production line,you feed the materials to screw conveyor.
4.How many workers are needed to operate the concrete fence machine production line?
----2-3 workers.