Share on (60217342080):
19Inch oem mount double open rack


| 19Inch oem mount double open rack | |
| Standards | Comply with ANSI/EIA RS-310-D,IEC297-2,DIN41494;PART1,DIN41494;PART7, ETSI standard |
| Features | |
| 1. | Unit design, easy installation, low cost, easily removable |
Application range |
| Widely applied to networking systems, educational equipments, broadcasting systems and communication systems |
| Load capacity |
Static load: 150KG |
| Surface treatment | |
| 1. | Degreasing, pickling, phosphating, laundering, powder coating |
| Standard Configurations | |||||
| Item | name | quantity | nit | materials | surface treatment |
| 1. | profile rails | 4 | pic | cold-rolled steel | powder coating |
| 2. | top/bottom covers | 4 | pic | cold-rolled steel | powder coating |
| 3. | pedestals | 2 | pic | cold-rolled steel | powder coating |
| 4. | casters | 4 | pic | --- | --- |
| 6. | cage nuts | 20 | pic | --- | --- |
| Type | capacity | width (mm) | depth (mm) | height (mm) | packing dimensions | volume |
| GR6622 | 22U | 600 | 600 | 1158 | 1400*145*240 | 0.048 |
| GR6632 | 32U | 600 | 600 | 1625 | 1550*145*240 | 0.054 |
| GR6637 | 37U | 600 | 600 | 1850 | 1780*145*240 | 0.062 |
| GR6642 | 42U | 600 | 600 | 2070 | 1995*145*240 | 0.069 |
| GR6647 | 47U | 600 | 600 | 2295 | 2220*145*240 | 0.077 |
f=front door

| 1. | Inquiry will be replied in 24hrs; |
| 2. | According to the actual situation or special circumstances to send samples |
| 3. | OEM&ODM are welcome |
| Believe us is the best choice for you ! If you have any doubts or if you need any information ,please don't hesitate to contact me. |




Our product delivery packing
Shipment pictures

1.Are you Trading Company or manufacturer? |
A: We are manufacturer, our factory has been established for 10 years |
| 2.What are your main market? |
| A:Mostly Europe and America, then Australia,South Africa |
| 3.How long time to make a sample: |
2-7 days if we make a new sample for you. If you just select our existing sample, we can send you sample the next day. |
| 4.Lead time: |
| 7- 30 days, it depends on the quantity and power sockt plug itself. |
More models and product display
New products from manufacturers at wholesale prices