Modern Stainless Steel Glass Canopy Fittings For Glass Door Canopy

Share on (60237961630):


Price:

Quantity:


Product Overview

Description


Specifications

stainless steel door canopy
1.Material:SUS304/316
2.Finish:satin or polished
3.Glass thick:8/10/12mm
4.Application:glass&cable


 


Modern Stainless Steel Glass Canopy Fittings/Accessories / Glass Door Canopy/window canopy 


 


Description:


 









































































glass canopy
Advantages:A) Variety types for selection
B) Competitive price (China mainland manufacturer)
C) Good quality (6 years experienced technical)
D) Excellent service (Years of export experience)
E) Prompt delivery
F) Different designs are available according to customer requests
G) OEM, ODM orders are acceptable
Glass thick8/10/12mm
Material: Adopt high grade material (SS304,SS316)
Application:Rain cover, using with φ10mm bar
Installation:Configuration briefness and easy to install, the creative design vividly foretelling the shape of the new trend.
Finishes:A) Polished stainless steel (PSS)
B) Satin stainless steel (SSS)
Package: Standard pakaging without any logo, can adjust customers request.
Payment terms:T/T or Western Union
Serviceable rangevilla, home, hotel, office, apartment, public facilities, other buildings
Delivery time:Usually within 15-30 days after receiving deposit.
MOQ: 300 pcs per item

 


Details


YK-8019.jpg


YK-8019.jpg


Finish-Show(ALIBABA).jpg


 


Refers Pictures


 canopy (12).jpg


canopy (6).jpg


Canopy_Kilternan_4.jpgGlassCanopies01.jpg


 


JINXIN Advantages:


1)Various kinds for customer selection(More then 500pcs different casting moulds)


2)Complete modle for client choice:1/4”,1/2”, 1”, 11/2”,2”, 3”, 4”, 42.4,50.8 


3)Professional experience and support special design (AUTO CAD & 3D)


4)Tailer Made(Offer the special design of your requiretments)


5)Competitive price with more discount(Real Manufactory)


6)Excellent quality control(100% check one by one)


8)In time delivery(15-30days after payment)


7)Good service before and after sales


9)OEM, ODM is acceptable


 


JINXIN Products,your BEST choice:


 













































JINXIN Basic Information:



Quotation



FOB Guangzhou Port of China,included all packing cost except special requirement.



Material:



All products are made by stainless steel 304 and 316. 


We can offer original Material Test report for refer.



Packing Details:



Each type of product is packed in separate inner boxes.


Each outer box weight is not over 20kgs.



Packing Marks:



Each carton indicates properly the pallet number,box number and 


code number of the product it holds,material type(AISI 304/306) and inside quantity.



Delivery:



In order to be in a position to in form the shipping agent accordingly, 


when goods are ready for shipment,we will send all details of the merchandise 


such gross and net weight,number of boxes/pallets and overall dimensions to client.



Delivery Time:



15~45 days after receipt of advance payment.



Documents Offered:



For shipment: 


Original Bill Of Loading


Original Invoice


Original Packing List



Payment Term:



30~50% in advance as deposit. Other balance is paid before delivery and shipment.



Bank information:


 



Company:JINXIN HARDWARE PRODUCT LIMITED


Beneficiary’s A/C NO:440449559838


Bank Code:004


SWIFT Code :HSBCHKHH



 


Factory-Show(ALIBABA).jpg


.jpg


Customer-Show(ALIBABA).jpg


ISO9001 2000.jpg


material inspection.jpg


 


Custom made






































1st Step:



Customer has showed his special requirements.



2nd Step:



We try to understand the conception and pattern from customer with simple traft or picture reference.



3rd Step:



Making the conceptive AUTOCAD drawing based on comminication and understanding.



4th Step:



Making the Detail and 3D drawing after fixed the design and other details.



5th Step:



Offer the quotation after confirm the design, material and surface treatment.



6th Step:



Made the sample for approval.



7th Step:



Test installation after demo mock up.



8th Step:



Big production, delivery and service after sales.



 


 


 


 


 


0.1964 s.