Share on:
1000L 2000L 3000L 5000L large Beer Brewery Equipment/Beer Manufacturing Equipment for Beer Plant
Parameter of Various Models
Output/Brew | 2000L | 2500L | 3000L | 3500L | 5000L |
Brews/Day | 2~3 | 2~3 | 2~3 | 2~3 | 2~4 |
Output/Month | 120~ 180kL | 150~ 225kL | 180~ 270kL | 210~ 315kL | 300~ 600kL |
Electric Supply | 3phase/380(220, 415,440)v/50 (60)Hz | ||||
Heating Source | Steam/Directly Fired | ||||
Area Request | >300M2 | >350M2 | >350M2 | >400M2 | >700M2 |
Brewmaster | 3 | 3 | 3 | 3 | 5 |
Detailed description of 1000L 2000L 3000L 5000L large Beer Brewery Equipment/Beer Manufacturing Equipment for Beer Plant:
Equipments Request | Components |
1. Milling System | Malt Miller |
2. Mashing System | Mash/Lauter Tun |
| Boiler Tank |
| Boiler |
| Heat Exchanger |
| Wort Pump |
| Stir Device (Optional) |
| Other accessories are available: 1.Ornamental Pipe; 2.Mashing Pipeline; 3.Yeast Feeder; 4.Venturi Tube; 5.Butterfly Valve DN40; 6.Butterfly Valve DN32; 7.Soft Pipe; 8.Dregs Rake; 9. Sugar Measuring Cylinder; 10. Saccharimeter; |
3. Fermenting System | Fermentation Tank |
| Other accessories are available: 1.L-Pipe; 2.Butterfly Valve; 3.Pressure Gage; 4.Solenoid Valve; 5.Vacuum Valve; 6.Cooling Pipe; 7.Thermal Insulation Pipe; |
4. Cooling System | Ice Water Tank |
| Refrigeration Machine |
| Centrifugal Pump |
| Evaporator |
| Ice Water Pump |
| Relative Pipes and Valves |
5. CIP System | Washing Tank |
| Sterilization Tank |
| Pump and Valve |
6. Filter System | Kieselguhr Filter |
| Membrane Filter |
| Filtered Beer Tanks |
7. Packing System | Fresh Keg Packing Machine |
| Pop Can Packing Machine |
| Glass Bottle Packing Machine |
8. Controlling System | Mashing Control Panel |
| Fermenting Control Panel |
| Refrigerating Control Panel |
Manufacture Technique of Large Beer Brewery Equipment/Beer Manufacturing Equipment:
Material | SUS304/316, red copper |
Structure
| Dish top cover |
Cylinder body | |
60°cone bottom | |
Dimple plate jacket for cooling | |
PU foam insulation | |
Polishing
| Mirror polished for interior surface 3A finished, RA≤0.22um |
Satin polished for exterior surface, 2B finished | |
Manway | Elliptical manway, can be opened inwards & outwards |
Connect style
| tri-clamp Nozzles on the tank
|
Male-thread Nozzles for jacket | |
Standard fitting
| 360°rotated CIP Spraying ball*1 |
Sample valve*1 | |
Temperature probe in thermowell*1 | |
Racking arm on cone*1 | |
Bottom outlet*1 | |
Butterfly valve*2 | |
Optional fitting
| Carbonate stone |
Pressure relief valve | |
Hops inlet on top |
1000L 2000L 3000L 5000L Brewhouse(Mash/Lauter Tank, Kettle/Whirlpool Tank,Hot Water Tank)
1000L 2000L 3000L 5000L Fermentation Tank
About Us
We are professional manufacturer of produce beer equipment. We are specialized in professional design, manufacture, installation and commissioning of various beer equipments and supporting facilities.
We supply turnkey brewery from 50L-20000L and related products like keg, keg filler and washer, bottle filler and capper, etc.
Advantage
Professional Beer Equipment manufacture with 8 years experiences in China.
Dedicated team of consulting Services&Professional team of technical engineers
Complete quality control and management systems
Industry leading manufacturing facilities
3Years After-sales services for our goods.
Complete beer line to meet different capacities and all kinds of beer
Customize machine can be offered(voltage,material,dimension,heating source and so on)
With CE & ISO9001:2000 Certification.
Certificates
FAQ
1.What is kind of your packging?
Export standard, wooden case, iron crate, or any suitable for long distance sea transportation.
2.How long is your delievery lead time?
After 30-45 working days when we receiving your payment.
3.Could you caculate the shipping for me?
Yes, please kindly let us know which port is nearest your place.
4.What is your term of payment?
50% T/T in advance, balance before shippment or other suitable for payment methods.
5. How to make an order?
1. Send one inquiry or email
2. check email and choose models in our catalogue
3. negotiate detail order
4. confirm proforma invoice and arrange deposit
5. You will get the equipment after 30-45 days.
500L micro brewery 600L brewery 1000L beer brewery
1000L-5000L beer fermenter 2000L beer fermenter 100L-800L beer fermenter