Professional cement mortar spraying machine with worm pump

Share on (60314771913):


Price:

Quantity:


Product Overview

Description


Professional cement mortar spraying machine with worm pump
 

undefined  

   With advanced design, it is used for grouting or spraying PU, resin or other waterproof &leakage stoppage. The mortar spraying machine is suitable for: expansion joint leakage, settlement joint leaks, subway, tunnel leakage, leakage of dam leakage, ground level ground, cracks, empty drum reinforcement , indoor and outdoor coating, cement mortar spraying, dry mortar spraying, putty powder coating, waterproof grouting and surface spray coating, waterproof coating, grouting, smallpox spraying, wall painting, coating, landscape painting, embossment effect paint spraying, spraying, arts and crafts emulsion paint, really stone paint, spraying the rockery, sculpture painting, spraying sound-absorbing material.

 

cement mortar spraying machine with worm pump
cement mortar spraying machine with worm pump
cement mortar spraying machine with worm pump
cement mortar spraying machine with worm pump

Send Inquiry >>>   

undefined

  1. High efficiency: flow up to 5-10 kilograms per minute, outlet pressure 20 to 35 kg.
  2. The light volume: overall only 11 kg, easy to carry.
  3. Easy operation , not easy to damage.
  4. Spraying can choose by a circular or fan nozzle construction, Suggestions (circular spray wall body, fan-shaped spray smallpox).
  5. Voltage 220 v.

Technical data:

 

Power

Flow

Granular material

Speed

Pressure

Weight(KG)

Length(mm)

Width(mm)

Height(mm)

800w/220v

1-10L(1/min)

Less than 2mm

0-1200(RPM)

20kg

11

 

700

400

850

 

Applications:

Suitable for indoor and outdoor spraying, cement mortar spraying, dry powder mortar spraying, putty powder spraying, waterproofing material and waterproofing surface spraying, ceiling spraying, wall spraying, coating/painting spraying, gardening, relief effect coating, art and craft spraying, emulsion paint, stone-like paint, manmade rock, carving and sculpture spraying, damping material spraying and other projects.


undefined

  • Before starting, add fresh water into the hopper and regulate the speed to the middle-high speed in order to achieve the effect of wetting pipe, only a short running and then draining the water.
  • Putting the even material stirred into the hopper, and then locking pulp exit of main machine and the pipe & nozzle.
  •  Before spraying, filling the pressure of air compressor to 8kg (matched air compressor 0.26-0.36m) and then connected to the nozzle.
  • After connecting to power, putting the gunpoint aiming the hopper, adjusting the air pressure and the speed until achieving the best state of fogging, shutting down the machine but non-stop wind.
  •  After the accurate Debug, immediately move the nozzle and spray jets to the construction site work.
  •  During the construction process, the pipe is filled with paints, not suitable for parking too long. If the power is failure, you should immediately dismantle the pipe to clean.
  • If filling pressure in the pipe, before dismantling & cleaning, you must put the cloth on it to protect your eyes, avoiding injury.
  • If starting the machine fails, first check whether the fire drills is broken or not and should replace it immediately.
  • Cleaning the body during the working or completion, making sure wetting the electric drill & box, avoiding damage.
  • After completion of working, must clean up the hoppers, pipes, nozzles, and rotary joints so as to work tomorrow
  • If detecting the exit of paint is weak power after a long time to work, you have to replace the pressure pump.
  • If it suddenly appears without feeding material in the work, while motor is still working, it proves that the nozzle has been plugged. You should immediately stop working and clean the nozzle, and then continue to work.
  • Nozzle is damageable (including the pressure pump). The standard nozzle pore is 4mm. When the fogging of nozzle is not satisfactory, you should immediately replace the nozzle.

    

undefined

1. The construction site must wear protective equipment (such as gloves, masks, goggles, safety helmet)

2. Water and electricity should be provided on site.  

3. The hand shall not be in the hopper when driving.

4. The construction site should be safe, covered and smooth.  

5. Machinery and circuit should avoid to expose in wet and open place.

 

undefined

 

 

 
 

undefined  

We value every inquiry sent to us and ensure a quick competitive offer. If you order to us, we can promise the quality.

We put your order into our tight production schedule to ensure you punctual delivery time and send shipping notice  to you as soon as your order is shipped. We respect your feedback after you have received the goods. 
Because we have more than 10 years of experience in waterproof industry, all our products conform to national standard! We can promise an excellent service and a prompt delivery! Your order is welcome at any time!

 

undefined

 

undefined

Q: Do you charge for the samples?
     According to our company policy, the samples are free, we only charge the freight. And we will return the   
     freight if you set the order .

 

Q: Can you produce the product according to customers' requirements ?
     Sure, we are professional manufacturer, OEM is welcome.

 

Q: Can you tell me your main customers?
     That's our customers' privacy, so we should protect their information. At the same time, please rest assured
     that your information is also safe here.

 

Q: Are you a factory or a trading company?
     Factory.

 

Q: What about the quality?
     We can provide you samples for quality inspection. If you order to us ,we must promise the quality , if some
     quality problem happened, we can have a negotiation of the compensation and sign agreements ,and our
     after-sales department will perform the duties as the agreements.

 

      Any questions, please feel free to contact us. we will give you a satisfied reply in 12 hours.

undefined


0.1813 s.