Mineral Processing Copper Lead Zinc Ore With Various Capacity Copper Ore Processing Equipment Ball Mill

Share on (60342267717):


Price:

Quantity:


Product Overview

Description


 

Product Description

Mineral Processing Copper Lead Zinc Ore Copper Ore Processing Equipment

Mineral Processing Copper Lead Zinc Ore Copper Ore Processing Equipment Project Description

Grid ball mill 2Copper Ore Processing Plant has two stages, crushing stage and grinding stage. Crushing stage works 12 hours, and capacity is about 20.83tph, after crushing, the material is crushed from 400mm into 20mm. Then grinding stage, grinding capacity is about 13.02t/h, and works about 20 hours. Afther grinding, the granularity is 70% of 200 mesh. Finally, Au and Ag will be in the copper concentrate.
1.Use the method of flotation to recycle CuS.
2.The Au and Ag of raw ore is valuable, but it is difficult to separate them from copper. Au and Ag will be in the copper concentrate.
Copper Concentrate Process

Detailed Flow of Copper Ore Ball Mill For Copper Ore Processing Plant Project Description

Raw material is fed into coarse crusher through vibrating feeder, after first crushing, then into fine crusher. After the material is crushed in the fine crusher, the material bigger than 20mm is transported back into fine crusher and recrushed, at the same time, the material smaller than 20mm gets into fine ore bin and then is transported into ball mill. After grinding, the grinded ore gets into spiral classifier, underflow will get back into the ball mill, and overflow gets into the process of one roughing three contentrating one scavenging flotation process. Flotation Concentrate will get into settling pond, and flotation tailings gets into settling pond, part of them will transport into tailngs pond. The water of tailing can recycle and reuse.

 

copper ore ball mill

Equipment List of Copper Ore Ball Mill For Copper Ore Processing Plant

copper ore ball millcopper ore ball mill

Detailed Parts Of Ball Mill

copper ore ball mill
copper ore ball mill
copper ore ball mill

Technical Data

TypeRotational speed
(r/min)
Balls weight
(t)
Feeding size
(mm)
Output size
(mm)
Capacity 
(t/h)
Motor power
(kw)
Weight
(t)
900×1800421.4≤200.075-0.890.65-218.53.6
900×2100411.7≤150.075-0.830.7-3.5153.9
900×3000412.7≤200.075-0.891.1-3.5224.5
1200×2400363.5≤250.075-0.61.5-4.73011.5
1200×2800316.8≤250.075-0.61.5-53713
1200×4500325.5≤250.074-0.41.6-5.85513.8
1500×3000316.8≤250.074-0.42-77517
1500×45002710.5≤250.074-0.43.5-811021
1500×57002715≤250.074-0.43.5-1013024.7
1830×30002613≤250.074-0.44-1216028
1830×36002615≤250.075-0.45-1316033.5
1830×450026.517≤250.075-0.65.5-2018535
1830×70002625≤250.074-0.46.5-2221036
2100×36002421≤250.074-0.46.5-2218546.8
2200×55002130≤250.074-0.410-2024548.5
2200×650021.735≤250.074-0.414-2638052.8
2200×75002133≤250.074-0.416-3038056
2400×300020.630≤250.075-0.415-5024559
2400×45002133≤250.074-0.415-6038065
2700×360020.639≤250.074-0.420-7040091.3
2700×400020.740≤250.074-0.420-8040094
2700×450020.748≤250.074-0.420-90430102
3200×45001865≤250.075-0.4According to different technology800137
3600×45001790≤250.074-0.4According to different technology850158
3600×600017110≤250.074-0.4According to different technology1250175
3600×850018131≤250.074-0.445.8-2561800252
4000×500016.9121≤250.074-0.445-2081500203
4000×600016.9146≤250.074-0.465-2481600218
4000×670016.9149≤250.074-0.445-2521800238
4500×640015.6172≤250.074-0.454-3062000280
5030×640014.4216≤250.074-0.468-3862500320
5030×830014.4266≤250.074-0.488-5003300403
5500×850013.8338≤250.074-0.4108-6154500525
Packaging & Shipping

Packaging & Shipping

cement ball mill 4

copper ore ball mill

 

Customer Site

Customer Site

copper ore ball mill

International Cooperation

International Cooperation

copper ore ball mill

International Cooperation

Company View

copper ore ball mill

 

1. If the customers inquiry our machines, we will quote as soon as possible.
2. Our engineer will design the project according to the information our customers provide us, which is included the flow chart, the flash of project.
3. After our customer makes sure our project, please pay 30% of total amount, then we will arrange our workshop to produce the products.
4. Twenty days later, we will package and ship the goods to ours customers after recieving the whole price.
5. If our customer needs our guide, we will send our after-sales person to guide the installtion.
6. We will provide the best price of wear parts to our customers in the lifetime of the machine.

 

copper ore ball mill


0.2058 s.