Light weight aluminum warehouse pipe rack storage pipe racking systems

Share on (60344031840):


Price:

Quantity:


Product Overview

Description


Product Description

Product Description3.jpg 

TFS Application

Application-.jpg

Warehouse Pipe Racking System aluminum tubular pipes packaging system material flow rack Low Noise industrial roller track china wholesale market direct buy suppliers chinese manufacturer top ten selling products

Aluminum tube

TFS aluminum--.jpg

industrial round tubes aluminium hand trolleys push flow rack assembled workstation racking system leveling feet roller tracks mounting pipe fitting 4 wheel platform trolley brake tube fittings 60 degree triangle truss conncetor anodized pipe aluminum tube connectors end caps oval flexible aluminum 

Tube Connectors

Tube connector

TFS-connector---_01.jpg

TFS-connector---_02.jpg

aluminium rack storage pipe rack system pipe warehouse storage rack size lean tube bracket removable folding disabled flexible overs steel galvanized pipe luxury stair clear floor mounted handrail pipe safety  step ladders 

Stock and Delivery

packing and stock

material handing trolley work table material table tubular framing system flow racks material shuttles workstation assembling process of household aotomobile light industry electronic industry pipe storage rack 

FAQ

FAQ to save your precious time!

 

Q1: What’s the standard length of your profiles and tube?

A: The standard length of profiles and tube are 5800mm to suit for small container, and we also can cut to specific length, however a surcharge of machining and material scrap cost will be charged accordingly based on each individual invoice.

 

Q2: What’s your MOQ?

A: we have no MOQ for our new customers, however a surcharge of USD80 will apply for all orders less that USD 1000 for custom handing cost purpose.

 

Q3: what is your payment terms?

A: The payment terms we accept is T/T or irrevocable L/C at sight, T/T preferred.

 

Q4: What’s the lead time for small order and mass production?

A: 1-3 working days for small order, and 3-10 working days for mass production of material, and the final lead time will be subject to each individual invoice.

 

Q5: What certification do you have?

A: We have ISO 9001:2008 certificate.

Contact

contact- - .jpg

aluminum pipe rack warehouse racking systems storage pipe storage shelving anodized aluminum storage modular shelving system light weight 

 

0.203 s.