Share on (60362244646):
Hot dip steel wire galvanizing production line with furnace
1. We have gotten ISO9001:2008 standard and certificate
2. Company established year: 1988
3. Company location: Wuxi city, 125km away from Shanghai
4. FOB port: Shanghai
5. Business type: Manufacturer
6. We can offer TUV certificate report
7. Number of employees: 100-200
8. Welcome to visit us, we will pick you up at Shanghai airport or other place near Wuxi
Production process: Pay-off --> Alkali washing(Degreasing,Ultrasonic) --> Water washing --> Pickling washing (Ultrasonic pickling) --> Hot water cleaning --> Fluxing(Coat assisting) -->
Drying --> Hot-dip galvanizing --> Wiping system --> Take-up
Successfully apply Ultrasonic cleaningto our Steel Wire Hot-dip Galvanizing Continuous Line, replace the traditional degreasing and pickling process. Advantage: The solution can be recycled, no pollution to be discharged;To reach the same production capacity, the occupied area is less than traditional pickling bath; No acid mist in the workshop, safe for workers and reduce the damage to workshop.
Technical parameter
Sr | Item | Specification |
1 | Raw material | Low, medium and high carbon |
2 | Wire diameter | Φ0.5mm-Φ12.5mm |
3 | Zinc thickness | 60-350g/m2 |
4 | Wire number | 8-40 wires |
5 | Speed | 10-120m/min |
6 | Production capacity | 1000-20,000 tons/year |
7 | Energy | Natural gas, Liquid gas, Electricity, Diesel, Coal |
8 | Working hours | 24h continuously |
9 | Line size | 100m(L)x3m(W)x1(H) |
10 |
| |

Wuxi Xinke Metallurgical Equipment Co., Ltd was established in 1996,invested and set up by Wuxi Xinke Autocontrol Research Institute.
We get more than 20 years exprience being the prefessional design and customized making for steel wire production continuous lines,such as steel wire hot-dip galvanizing continuous line,steel wire electro-galvanizing continuous line,steel wire heat treatment continuous line,and etc.
We hold 26 national patents,12 of them are inventive patents.

We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact.
We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats.
We will send engineer and high level technician when installing the production line.
We will test the whole line for one month and train the operater.
We will send engineers to service machinery overseas if necessary.
New products from manufacturers at wholesale prices