Машина для розлива пивных бочек

Share on (60371835533):


Price:

Quantity:


Product Overview

Description


   Beer keg washing filling unit machine 750banner1

 

 

Product Description

 

1, Specification

table-board size

1200mm×450mm

table-board height

700mm

exterior dimension

1200mm×1400mm×1900mm

cylinder max stroke

300mm

net weight

260Kg

power

18KW

Heating 

(electrical heating) 220V three-phase

capacity

20~40kegs/hour

cleaning mode

keg topside down

applicable keg

diameter φ250~φ500,   height 360mm~600mm

 

 

2, Technical parameter

air source pressure

0.6~0.7Mpa

CO2 source pressure

0.3~0.4Mpa

cylinder valve pressure

0.5~0.6Mpa

CO2 valve pressure

0.2~0.3Mpa

Air-blow valve pressure

0.2Mpa

sterile water pressure

0.4Mpa

power voltage

Three-phase   220V 60Hz

 

 3. Main Structures and Features

 

    This machine mainly contains the frame, electric system, air system and other pipeline system. The features are as below:

1. All parameters (time values) can be adjusted without stopping the machine.

2. Maximum straight-line design on main cleaning pipelines makes sure the powerful and thorough scouring.

3. Twin-acting pneumatic valve with reliable quality and anti-high temperature characteristic.

4. Adoption of world top products as main accessories makes sure premium quality.

5. The sterile water and the lye water can be recyclable.

 

4. Working Procedures

Load the keg → start (cylinder pressing tightly) → air blowing (draining residue) → scoured by clean water → air blowing (draining water) → scoured by lye water  extracting tube scoured by lye water  air blowing and recycle → scoured by clean water → extracting tube scoured by clean water air blowing (draining water)  scoured by clean water  air blowing → scoured by sterile water  air blowing  prepare CO2 pressure → reset the cylinder → unload the keg

 

beer kegs Filling machine 

 

4476C598024E22F9F62E16E979CCAA31

 

 

keg filling single head

  keg washing machine

 

 5. Usual Malfunction and Removing Method

 

 

Malfunction

Possible reason

Moving method

Leakage of cleaning head

loose cylinder

check the cylinder pressure

incorrect orientation

orient the keg correctly

loose gasket

Adjust gasket

Power disconnection of PLC

incorrect voltage value

check the power

high ampere value(≥3A)

check the circuit

Extinguishing of indicator

Indicator damage

change the indicator

Remaining liquid in keg after cleaning process

insufficient air-blowing time

adjust air-pumping time

damaged extracting tube

change extracting tube

Virus standard unconformity

expired disinfectant

change disinfectant 

 

     

500-Liter-beer-brewing-equipment-for-hotel 

Welcome to your inquiry! 

 

 

 

 


0.2267 s.