Алюминиевый машинка для литья свинцовых сплавов (криокамера) Кровать плеча машина de coulee sous под давлением от пыли

Share on (60378364941):


Price:

Quantity:


Product Overview

Description



aluminium cold chamber die casting machine chambre froide Machine de coulee sous pression


Details Images






Products Description


ITEMS
UNIT
ZLC-300
Locking Force
kN
3000
Die Open Stroke
mm
470
Ejector Force
kN
150
Ejector Stroke
mm
110
Die Height(Min.-Max.)
mm
250-650
Die Platen Size(HXV)
mm
900×950
Space Between Tie Bars
mm
560×560
Shot Position
mm
0,-125
Shot Strock
mm
440
Casting Force(intensify)
kN
330
Plunger Diameter
mm
50,60,70
Injection Weight
kg
1.5,2.1,2.9
Casting Pressure
MPa
170,118,87
Casting Area
cm²
172,252,343
Casting Area Max
cm²
750
Chamber Flange Diameter
mm
110
Chamber Flange Protrusion
mm
12
Plunger Penetration
mm
165
Main Pump Driving Motor
kW
18.5/30
Working Pressure
MPa
14
Oil Tank Capacity
L
750
Machine Dimensions (L×W×H)
mm
6500×1700×2700
Referential Machuine Weight For Uplifting
T
11.8




Company Profile












Certificate




Sales and Service






Transport & Payment




FAQ


Q: Is your company a trading corporation or manufacturer?
A: Our company is a die casting machine manufacturer with more than 25-year experience.

Q: How's your products?
A: We use YUKEN machine valves imported from Japan. Imported components are used for hydraulic units including REXROTH from Germany and Eaton VICKERS (America).The SiemensS-7200 control system with LCD monitor(Germany) can accurately control the movement of machine.

Q: How can I choose the suitable machine?
A: Our machines have many types. Different type depends on your product size. The bigger product you make, the bigger machine you need.

Q: How’s your price?
A: We do our best to keep our price as low as possible without sacrificing quality.Considering the quality of the machine offered, the price is very competitive.

Q: How’s your after-sales?
A: One year after sales warranty.We can also send our engineer to your factory to install and commissioning the machine, and train your staff.




0.0196 s.