500KW 5000KW Municipal solid waste rubbish power plant/refuse pyrolysis gisifier power generation

Share on (60439423887):


Price:$500,000.00

Quantity:


Product Overview

Description



Product Description


Specification


Showroom Location
Italy, Viet Nam, Philippines, Brazil, Indonesia, Russia, Thailand, Kenya, Chile, South Africa
Warranty
1 Year
Machinery Test Report
Provided
Gas temperature of gasification furnace outlet
700~800℃
Gas temperature of the outlet after cleaning and cooling
<45℃
Production volume of biomass gas
1200-1500Nm3 /hr


Packing & Delivery




To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.


Company Profile








Founded in 1985, FENGYU has been a trailblazer in renewable energy and sustainable technology. At the core of our mission lies transformation of waste into clean, renewable energy sources. With a comprehensive portfolio including biomass gasification, MSW gasification, insulating oil filtration, and SF6 gas recovery, we have redefined the waste-to-energy landscape. Our pioneering technologies not only address environmental challenges but also promote efficiency and sustainability. By excelling in insulating oil filtration and SF6 gas recovery, we're setting the standard for responsible resource management. FENGYU is dedicated to realizing a sustainable future, where waste becomes a valuable energy resource, and innovation drives us toward a greener world.


FAQ


0.1831 s.