Share on:
Portal harbour cranes are state-of-the-art, economical and flexible handling machines on rails. They are based on the well proven mobile harbour crane technology and can be easily integrated into existing or planned terminal infrastructures.
Strength: |
Use on special-purpose quays for tough continuous-duty bulk handling
Possibility of providing specific portal solutions in line with terminal requirements
Modular construction
Comparatively low total weight
Optional crane parts: |
ITEM | NAME | CHINA BRAND SUPPLIER | FOREING BRAND SUPPLIER |
1 | Motor | NEW GREAT POWER JIAMUSI MOTOR JIANGLING | ABB SIEMENS |
2 | Reducer | GUOMAO TAILONG ZHONGRUI | SEW FLANDERS |
3 | Brake | CHANGJIANG JIN'GU | SIBRE |
4 | Bearing | HWL BEARING | SKF |
5 | Electric System | CHINT | SCHNEIDER ABB |
6 | Frequency Converter | YUDING APPOLLO | YASKAWA |
7 | Wire Rope | NANTONG | / |
8 | Steel | HBIS | / |
Drawing and data: |
Technical table | |||||||
Item | Data | ||||||
Capacity | 16-40t | ||||||
Working range | 30-43m | ||||||
Wheel dis | 10.5-16m | ||||||
lifting speed | 50-60m/min | ||||||
Luffing speed | 45-50m/min | ||||||
Rotating speed | 1-1.5r/mim | ||||||
Travelling speed | 26m/min | ||||||
Power source | as your demands | ||||||
Other | According to your specific usage, specific model and design will offer |
Packing/Delivery Adevices: | ||||||||
1 | Crane Beam & Main Equipment: Packaged by color strip woven plastic cloth for abrasion reduce and | |||||||
moisture-proof. | ||||||||
2 | Crane Kit & Electric Accessories: Export standard high quality plywood case for reduce distortion. | |||||||
3 | Loading & Delivery Option: Prefered to choose container loading for better cost saving. Oversize beams | |||||||
and equipment can be cut for cantainer loading as suitable size crane products. Bulk cargo shipment will be | ||||||||
used when container loading not available. | ||||||||
4 | Loading Port: Qingdao Port is prefered, Tianjin Port, Shanghai Port etc. available on your demand. | |||||||
5 | Delivery Time: Lead time 25 days, port time 5 days, estimate time of arraival (ETA) to Xxxxxx Port 30 days. |