Share on (60447563307):
ADTO factory one-time pouring reusable 6061-t6 aluminum alloy aluminum formwork concrete forms for construction
1)Specification of Aluminium Formwork System
Material | 6061-T6 Aluminium alloy |
Main Components | Beam |
column | |
wall | |
Prop | |
Others | |
Applications | Exhibition setup |
Interior refurbishing | |
All the towers can be connected together for multi-purpose | |
Safe working load | 60KN/m2 |
Size | Non-standard: custom-made as per buy’s requirements |
Features | Easy to Handle |
One-time Pouring | |
High Concrete Pouring Rate | |
More Reuses | |
Great Recyclable Value | |
Environmental Friendly |
2)Advantage of Aluminium Formwork System
1 | Easy to Handle |
2 | Unsurpassed construction speed |
3 | Good stability, high bearing capacity |
4 | High Concrete Pouring Rate |
5 | Great Recyclable Value |
6 | No construction waste |
3) Comparision of Aluminium Formwork and Wood Formwork
NO. | Reference | Aluminum Formwork | Wood Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Turnaround times | 200times at least | 3-5times |
3 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
4 | Recovery value | $67/m2 | $0.8/m2 |
5 | Subtotal artificer materials | $4.4-4.9/m2 | $7.5-8/m2 |
6 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
7 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
8 | Ergonomics | 20m2/day | 15m2/day |
9 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |



ADTO GROUP is a leading manufacturer of formwork,scaffolding,steel&aluminum products,etc. Since 1998, the group has developed 30+ subsidiaries and 20+ manufacturing plants.We have the flexibility to tailor programs to reach our customer's unique requirements. Word of mouth from customers is a testament to our
service.
HUBEI ADTO ALUMINUM FORMWORK MANUFACTURING CO.,LTD, as a professional plant of ADTO GROUP for aluminum formwork system, is located in Hubei Province. lt covers an area of 800,000 square meters,12 production lines that ensure monthly output of at least 50,000 square meter. Till now we have exported to South east Asia( namely Philippines,Thailand,Vietnam,Sri Lanka),South&North
America(Uruguay,Mexico,Canada), Africa and Middle East countries.






1.What is Aluminum formwork?
The concrete pouring process requires certain steps to ensure the concrete will not lose form while it sets. Aluminum formwork is one type of material used to help the concrete hold shape until it is solid and can hold shape on its own
2.Why choose Aluminum formwork instead of wood and steel formwork?
1.Light weight,Easy to transfer
2.More safety.
3.High effiency
4.Economical
5.Environmental friendly
6.Wide application
7.High quality,no need plaster
8.Can be recycled and reused 300 times.
3.Why choose ADTO GROUP?
1.China professional Manufacturer
2.Best designers to meet clents' requirement
3.Many years experience of exporting
4.Good sales service
5.ADTO Brand is famous all over the world
4.What's your payment terms?
T/T 30% in advance &T/T 70% upon sending the copy of bill of Lading,L/C 100%,or negotiate according to the order.
5.What is your delivery time?
30-35 days after received the advance payment or L/C.
6. Do your aluminum formwork system contains other accessories?
Aluminum formwork system includes aluminum formwork panel, support system, fastening systems, accessories system.
You can also pick and choose one of them whatever you need.
7. We need some specificial size, can you do?
We can also manufacture upon your requested design with different size.
New products from manufacturers at wholesale prices