New design BH26 gas stove burner head brenner with great price

Share on (60473689434):


Price:

Quantity:


Product Overview

Description


Product Description

Model: BH26

Thermal power(kw) :154-308

Electrical supply: 1ph, 220V/50Hz

control method: dual-stage fire control

Absorbed electrical power: 0.37KW



Power table
Series
Model
Light oil flow(kg/h)
Control Means
Max. viscosity of the oil
Power source
Power
(W)
Min
Max
BH
26
13
26
Sec fire
1.5
1ph*220v*50hz
370

Main features

1,Easy operation;
2,Convenient assembly for all parts;
3,Efficient maintenance, cleaning and inspection;
4,Critical spare parts adopt renowned brand;

Control process:

Our gas burners can be divided into two types which are single-stage and dual-stage according to regulating control method. 


After single stage gas burner is ignited, only one stage heating power works, which cannot be adjusted. The heating power of four models ranges from 42kw to 550KW. 

The dualstage gas burners have two stages heating power. When ignited, the 1st stage starts working; as the load keeps increasing, the 2nd stage starts working, too, whose heating power ranges from 70kw to 500kw.

Performance

1 Unibody design with aluminum shell

2 Sliding flange can locate the nozzle according the status in boiler furnace

3 Superior design of the nozzle make sure the best consumption when the burner working

4 Electrical devices to control the procedure and the safe protection

5 Delivering in assemble, out of the box

 

 

 

 

 

Working time

 

Fuel

 

 

 



Certification
Packing & Delivery
Packaging
Size
105*47.5*50
Weight
30.5kgs
 
 
 
Packaging Details
The compact size and light-weighted is very easy for the installation and adjustment, and long distance Express shipment.
Board case or wooden case package, around 22kgs per case, easy for DHL express shipment or LCL sea shipment 

Devices and Components: 
key parts and components are imported from original supplier, top quality devices to match the design and cost down. 

Delivery time and Payment term: 
For sample orders, 2-5 days after receiving payment; for bulk order larger than 10 pieces, 7-15days after receiving initial payment, based on different item size.
Western Union payment or T/T in advance for sample orders;
For bulk orders, 30% T/T down to start production, while 70% balance before shipment.

Related Products

0.1965 s.