Share on (60475831120):
Tenroy Stamping Die Features:
1. Die Insert Tolerence: +/-0.005mm
2. Stamping Speed: 1000SPM/min
3. Tooling Life: 50-300 million times
4. Tooling (Mold) design and Manufacture
5. Manufacture the parts according to the Stamping Machine.
6. Riveting, Welding or Screw tap according to Customer's require.
7. After finish manufacture process we will test the parts by the Image measurement instrument, Caliper, Angel Gage etc.
8. After make sure all the dimension can reach customers’requirement, we will make the surface treatment process.
9. After finish surface treatment we will testing all the parts by worker so that we can make sure the parts which we sell is 100% qualified.
10. After finish testing we will pack the parts by Vacuum Package Machine.
General Capabilities | Design Modeling (2-D, 3-D) | Die Location Technical Support | Inspection | ||
Detail Tooling Documentation | DFMEA/PFMEA | Quick Building Prototypes | |||
Die Types | Forming Dies | Precision Progressive Stamping Dies | Secondary Dies | ||
High Speed Steel Dies | Precision Blanking Dies | ||||
Tooling Material | Carbide(CD650,V3,KD20) | ASP-23 | ASP-60 | ||
S55C---45#55 | AL7075 | SKD11 | |||
Tooling Life | 50 Million to 300 Million Times | ||||
Die Concept | 2-Plate Die | 3-Plate Die | Module Die | ||
Production Equipment | CNC | SODICK Nice Surface EDM | P/G | ||
Drill | SODICK Wire Cutting Machine | J/G | |||
Milling Machine | WAIDA Profile Grinder Machine | ||||
Stamping Equipment | AIDA | PURDER | KYOL | ||
MICO | |||||
Stamping Product | Custom Stamping | SIM Spring | Spring | ||
Battery Spring | Shield Drawing | Press-Fit Terminal | |||
Lead Frame | Power Terminal | PC Terminal | |||
Additional Services Provided | Custom Packing | Packaging | Heat Treat | ||
Plating | |||||
Delivery | 3-6 Week | 4-8 Week | |||

Tenroy has its own R & D team formed with 5 professional technicians, providing customers with mould design and selection, mould usage problem solution, mould maintenance and repair knowledge.
We adopt imported high quality tool steel. Each of ourtools and bladewill be tested before shipment. And their stable quality with long working life will be your best choice.
Mass production of standard parts, smart stock! The lead time for standard type is 3-5 working days. And for special shape tools and blades, lead time is around 10-15 working days.
Packing Details: pack with carton box, 1set/small box, many sets/big strong carton box or wooden case.
Delivery Details: 3-5 working days


A full range of pre-and after-sale technical support services to help customers improve product value. Continued after-sales service will lift the customer's worries in using our toolings. For each of our tools and blades, we will provide one year warranty!

Standardized and mass production! Factory direct sales with reasonable prices! Customize toolings with professional design will be more in line with customer's product, cost-effect and save your money and time.

Forpress brake toolsadopt 42CrMo and advanced processing technology. For punch press tools, we produce it with SKH-51 which can make the tools more durable and wear-resistant. Forshearing blades& variousindustrial cutters, they are made from a special analysis of high carbon, high chrome tool steel.

A: We are factory.
A: Generally it is 3-5 days if the tools are standard. or it is 15-20 days if the tools isspecial formingshape.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
New products from manufacturers at wholesale prices