Share on (60488880909):
passenger moving pavement/ moving walk elevator/moving walkway
Moving Walkway Advantage
1.Solve the transportation problem with a huge flow of people;
2.Meet long-distance walking and carrying luggage, baby strollers, carts disability vehicles, especially for the occasion of the upstairs and downstairs;
3.Convenient for people’s travel and shopping.
Moving Walkway Usage
Mainly used in airports,supermarket,exhibition centers and transport conversion station.
Moving Walkway Parameters
Type 1
Angle | Speed (m/s) | Step width (mm) | Span (mm) | Other positioning dimension(mm) | ||||||||
|
|
|
| minLP | LU | LS | B | C | minD | E | K1 | K2 |
10° | 0.5 | 1000 | 5.6713H+2744 | 5600 | 2114 | 2300/tg α+LU | 1237 | 1530 | 1630 | 1500 | 15000 | 30000 |
800 | 1037 | 1330 | 1430 | 1300 | ||||||||
11° | 1000 | 5.1446H+2780 | 5150 | 2150 | 1237 | 1530 | 1630 | 1500 | ||||
800 | 1037 | 1330 | 1430 | 1300 | ||||||||
12° | 1000 | 4.7046H+2816 | 4800 | 2186 | 1237 | 1530 | 1630 | 1500 | ||||
800 | 1037 | 1330 | 1430 | 1300 | ||||||||
Reaction to support in KN (L in m) (1KN=100kg) | ||||||||||||
Step width (mm) | 1000 | 800 | ||||||||||
No.of supports | RD | RU | RM1 | RM2 | RD | RU | RM1 | RM2 | ||||
2 | 4.9L+6.2 | 4.9L+14 | -- | -- | 4.25L+8.2 | 4.25L+18 | -- | -- | ||||
3 | 2.2L+5 | 2.2L+14 | 6.1L+4.2 | -- | 1.9L+8 | 1.9L+17 | 5.2L+8.2 | -- | ||||
4 | 1.5L+6 | 1.5L+15 | 3.45L+5 | 3.45+5.2 | 1.3L+9 | 1.3L+17 | 3.1L+9.2 | 3.1L+10 | ||||

Type 2


Moving Walkway Show


Package:
plywood suitable for export package and long ocean transportation.

Shipping:
30-45 days after signing the contract.

Product Process

Why Choose Us?
DEAO elevator work teams & customers

DEAO elevator engineers on site
DEAO elevator working places

DEAO elevator samples

DEAO elevator certifications

Q1. Which countries have you exprted?
A:The countries we have exported include: Singapore, Australia, Indonesia, Kazakhstan, Sri Lanka, Maldives, Iran, Saudi Arabia, Ghana, Armenia, Morocco, Nigeria and other countries as well as to Hong Kong and Macao,etc.
Q2.If your engineer come to our country to fix the elevator and do some training, how much will it cost?
A:The cost mainly contain the cost of round-trip flight tickets, board and lodging as well as visa fee. Staff cost is normally 100USD/day/person. But it will depend on a large equipment or installation and debugging of the complete elevator.
New products from manufacturers at wholesale prices