FAQQ1. Are you a factory or trading company?
A: We are a factory,more than 5,000 square. Located in Shenzhen,China.
Q2. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We could support show you production and picture of the products and packages.
Q3. How about the delivery time?
A: Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the ordered items and quantities.
Q4. Can you produce according to the samples?
A: Yes, we can produce according to samples or technical drawings. We can also make the molds and fixtures.
Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the sample cost and the shipping cost should be paid.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% Full check before delivery.
Q7.Can I visit your factory?
A: Welcome to visit, you will be more confident to us because of our professional control from design,production to shipment.
Q8.How to buy your products?
A: You need to do as followings:
* Confirm Current Rating and Number of Contacts
* Confirm Assembly style
* Confirm Cable Wire guage
* Confirm Cable Length and Material.
