Share on (60507834394):
Y Type globe valve drawing
Size:1/2" -24" or DN 15-DN600
Pressure: Class150LB-2500LB or PN16-PN160 or JIS 10k-40k
Material: A105,LF2,F11,F22,F5,F304,F316,F304L,F316L(1/2" -2" )
WCB,LCB,WC6,WC9,C12,C5,CF8,CF8M,CF3,CF3M (2 "-24 ")
Design & Manufacture Std.: ASME B16.34,BS1873
Face to Face Std.:ASMEB16.10, JISB2002,DIN3202,BS2080
End Connection Std.: ASME B1.20.1,ASME B16.11,ASME B16.5, JISB2212-JISB2214, DIN2543-2551
Test Standard: ISO5208, API598, JISB2003, BS 6755
Structure Type: S-Pattern, Oval Pattern, Throttle Pattern
Operated way: Hand wheel, Gear, Pneumatic, Electric Actuator.
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
Our Workshop
Our Warehouse
Our Team
We will have a very strict inspection for the coming raw material which done by our QA Dpt.
KS invested a more effective control line with Germany HECKERT machining center, CNC lathe, CNC miller, CNC driller,
Passed the ISO9001:2008 quality system authentication and API 598&API6D Request
Packing Details : KS Flow standard Seaworthy packing to be applied.
Delivery Details : EX-works 45-60 calendar days after we received your confirmed order, if 3rd party inspection required, delivery should be extended accordingly.
KS Flow launched our quality management and safety system as ISO 9001, ISO14001, OHSAS18001 and awarded API 6D, API 600, API 607, API 6FA, CE/PED approvals for the product.
Project: Changxindian Oil Storage Project
Client: PetroChina
Year: 2014
Location: China
Product: Ball, Gate, Globe , Check Valves
Materials: WCB, F316L, CF8M
Size: NPS1/2 ~ NPS36
Rating: ANSI150lb ~ 300lb
Qty: 186 pcs
Project: Power Plant
Client: MDEPC
Year: 2013
Location: Egypt
Product: Ball, Gate, Globe , Check Valves
Materials: WCB, CF3M, CF8M, F316
Size: NPS2 ~ NPS16
Rating: ANSI150lb ~ 600lb
Qty: 340 pcs
Project: Power Plant
Client: CNEEC
Year: 2012
Location: Thailand
Product: Ball, Gate, Globe , Check Valves
Materials: WCB, A105, CF3M, F316
Size: NPS1/2 ~ NPS20
Rating: ANSI150lb ~ 900lb
Qty: 230 pcs
A: Quality first,professional technical second,excellent service rank third.price should be last one
A: EX-works 45-60 calendar days after we received your confirmed order, if 3rd party inspection required, delivery should be extended accordingly.If we got the stock,4-10 days will be needed
A: Yes,we offer.But it is charged cause what we offer is standard.So if its in bad quality ,we will compensate for it.And we will take charge of the lost what we brought
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
New products from manufacturers at wholesale prices