12.0KW(15.0KVA) SILENT AIR COOLED DIESEL GENERATOR HM15000DS3

Share on (60511898080):


Price:

Quantity:


Product Overview

Description


 

Product Description

 

Diesel generator set HM12000DS3

1).FREQUENCY:50HZ

2).OUTPUT:12.0KW

3).DC OUTPUT:12V/8.3A

4).VOLTAGE:400/230V

5).POWER FACTOR: 0.8

6).PHASE:THREE EPHASE

7).EXCITATION SYSTEM:TRANSISTORIZED SELF-EXCITATION CONSTANT(AVR)

8).ENGINE:HM2V292FE

9).ENGINE TYPE:TWO-CYLINDER,VERTICAL,4 STROKE,AIR-COOLED,DIRECT-INJECTION

10).DISPLACEMENT:999cc

11).FUEL TANK CAPACITY:28L

12).LUBE OIL CAPACITY:3

13).STARTING SYSTEM:ELECTRIC START, WITH WHEELS AND HANDLES

14).DIMENSION:1280X750X940MM

15).N.W.:230KG

 

Main Features:
1. With CE certification and so on, powered by advanced diesel engine. 

2. Provides stable voltage and current.

3. Noise-reducing enclosure, made of high-efficient noise-proof material. 

4. Large fuel tank, ensuring hours of continuous output. 
5. Advanced direct fuel injection system. 
6. Large silent muffler & air-cleaner, reducing exhaust and intake noise. 
7. Overload protection for safe running.

 

HM12000DS3HM12000DS-meitu

 

HM12000DS3.png

Company Information
Business Type:Manufacturer
Main Products:

gasoline generator,gasoline engine,gasoline water pump,

diesel generator, diesel engine, diesel water pump

Location:Jiangsu, China (Mainland)
Year Established:2004
Number Of Employees:101 - 200 People
Total Annual Sales Volume:US$5 Million - US$10 Million
Main Markets:

Domestic Market, Africa, Southeast Asia, Mid East, Eastern Europe

Average Lead Time:20~30 Day(s)

 

 

FAQ

 

Q: Where is your factory located? How can I visit there?
A: Our factory is located in Yancheng City, Jiangsu Province, China, about 4 hours bus or 1 hours flight from Shanghai . All our clients, from home or abroad, are warmly welcome to visit us!


Q: How does your factory do regarding quality control?

A: From the internal parts to the outside packing, we not only make standard quality test, but also think ahead for a better solution. Except company QC system, We have achieved CE &  ISO9001:2008.

 

Q: How about guarantee?

A: It's within three months after goods is discharged in the destination.
During that period, if some breakdown easily spare parts need to change, my factory offers free. For example, fuel cock,spark plug,starting hand,etc


0.1917 s.