Tobee Effluent Handling
$12,600
Share on (60518750558):

HGP-1A | -F | 8 | R | -X | 2B | |||
Model | Installation | Displacement | Rotation | Shaft | Flange Type | |||
HGP-1A PR1 | F: Flange | 1,2,3,4,5,6,8 | (Viewed from Shaft) R:CW L:CCW | X:Key Shaft Y:Spline S:Taper | 2B,4BD, 4DE | 2B: SAE2-bolt 4BD:DIN4-bolt 4DE:Europe 4-bolt 4JB:LJIS4- bolt | ||
HGP-2A PR2 | 2,3,4,6,8,9,11,12 | 4JB | ||||||
HGP-3A | 6,8,11,13,14,17,19,23,25,28,30 | 2B 4BD | ||||||
GPY | 3,4,5.87,8,9, 10,11.5 | |||||||








New products from manufacturers at wholesale prices