Share on (60518774870):
Green Peas Frozen Processing Machines,Beans Quick Freezing Production Line


Application
SP-I Model pre-treatment production line for quick-frozen vegetable mainly consists of :high pressure cleaner,sorting conveyor,bubble cleaner,spiral blancher,normal temperature cooler,ice water pre-cooler and vibration draining machine so as to realize automatice pre-treatment processes such as cleaning,sorting,blanching,cooling,pre-cooling and filtering of vegetables.
The equipment can be both operated singly and used in combination with others,It can be freely placed and provided with other auxiliary devices of garden bean,asparagus,broccoli,taro,string bean,young soy bean,sweet corn,strawberry,cherry,apple dice,onion,tomato,mushroom,pumpkin dice,spinach,bean sprout and other fruit and vegetable products.
The equipment is completely made of stainless steel for the convenience of cleaning and maintenance,which fully meets hygienic requirements for exported foods.
Main features
Procedure
Freezing processing line
washing--cutting--blanching--normal temperature cooling--ice water cooling--vibrative draining--conveying and material spreading--IQF









Q1: Are you a factory or trading company?
A1: We are a manufacturer with self-support right of import and export. We have a professional team to
provide pre-sale and after-sale service.
Q2: Where is your factory? How can I visit your factory?
A2: Our factory is located in Shaoxing City, Zhejiang Province. It is near to Hangzhou Xiaoshan Airport
and Shanghai Hongqiao Airport. Warmly welcome you to our factory for a visit!
Q3: What’s the voltage of your machines?
A3: Normally 380V, 50HZ, 3Phases. Special demands can be customized.
Q4: What are the payment terms?
A4: We accept T/T and L/C.
Q5: What’s your advantage?
A5: (1) high quality and reasonable price;
(2) fast response and professional suggestion;
(3) integrated solution for food processing industry;
(4) we provide installation and training.
Q6: What is your Minimum quantity?
A6: MOQ is one set.
Q7: How long to deliver the products?
A7: It depends. Different machines take different manufacturing time. Normally 30-120 days. For urgent
order, it can be negotiable, please contact sales person.
New products from manufacturers at wholesale prices