Pillow Stuffing Machine Ball Fiber Pillow Filling Machine (60538485907)

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description


Pillow Stuffing Machine Ball Fiber Pillow Filling Machine

Characteristics of the Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

  1. 1. The loosing and filling cotton machine is professional machine for filling the pillow, the sofa, the cushion and others.
  2. 2. The biggest advantage of the machine has loosing and filling function, which is the biggest advantage of ii. So the customer needs not to equipment the loosing machine, which can save the cost. 

Specifications of the Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

 

Model 

Power 

Voltage 

Size (mm)

Weight(kg) 

Loosing rate

capacity

HL150

4kw+0.75kw

+2.2kw+1.5kw

380v/50HZ

3300*880*920

560

98%

70-80kg/h

 

Main features of Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

Raw materials for a variety of cotton fibers (such as wool, polyester,spewing) opener mix broken sponger(including scrap),Spewing or down,ect. Into the machinery , the machine automatically cotton fiber opening,sea cotton break automatically mixed in one, then fill to the product.

The functions of Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

1.a carding used alone

2.You can use the carding cotton filling

3.you can use a separate pieces do.

4.Can be broken carding wool or feather filling mixed use

the photo of the Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

 

Fiber filling machine4 (1).jpg

Fiber filling machine4 (2).jpg

Fiber filling machine6 (1).jpg

Fiber filling machine15 (1).pngFiber filling machine15 (2).png

 

the final product of Pillow Stuffing Machine Ball Fiber Pillow Filling Machine :

Fiber filling machine8 (1).jpg

Fiber filling machine1123.pngCotton filling machines2 (1).png

Fiber filling machine1112 (1).pngFiber filling machine1165 (1).png

 

 

Packaging & Shipping

 PACKAGE:

Standard export carton packing, fit for multiple handing and long distance marine shipping.

DELIVERY TIME:

3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

castor oil extraction line

Company Information

castor oil extraction line

Zhengzhou HongLe machinery & equipment co.ltd is engaged in the development, design, manufacture and sale of meat processing machinery. Zhengzhou HongLfood machinery factory over the years adopts many new ideas, absorbs a wide range of advanced technologies worldwide as well as excellent processing and testing equipment, and takes a reliable strict quality guarantee system and an important aftersales service system to win customers' trust in the industry.

 

We have strong technical force and standard management. Our existing products are related to the meat processing industry and flour product processing industry, including frozen meat grinders, cutting machines, mixers, saline injection machines, roll kneading machines, filling machines, vacuum and surface machines and mixing trap machines, totally 20 categories of products. 

 

We are willing to join hands with customers for common development and contribute to the revitalization of the food processing industry.

FAQ

 

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

 

CONTACT.jpg


60538485907
0.0328 s.