JIUCHEN 4kg Electric Metal Auto Casting Melting Furnace 1150C

Share on (60541090477):


Price:

Quantity:


Product Overview

Description


Product Description

Jewelers have used them for decades to melt gold and silver for casting or scraping purposes. Now with automatic temperature control standard, the JIUCHEN Electromelt is easy to use and well proven in the workshop.
Inspect your crucible frequently for cracks, wear and deterioration. The crucible walls and base
sloughs off with each use, causing the graphite crucible to become thinner. A leaking crucible can cause element and thermocouple failure.
only 1/4 to 1/2 the metal; once that is melted,
add the remaining.

\t
Product Name
\t
1-4KG Gold Metal Melting Furnace
\t
Material
\t
stainless steel
\t
Construction
\t
consists of a cylindrical furnace, an insulated handle for easy pouring, and a temperature controller.
\t
Heating
\t
Heating elements surrounded working SIC chamber,which is no crack,no distoration.
\t
Insulation
\t
Multilayer insulation with double thickness of ceramic fiber
\t
Working temp
\t
2192F (1200C) Temperature controlled with an accurate digital thermostat
\t
Melten Material
\t
Aluminum, Gold, Lead, Silver, Sterling Silver, Tin & Zinc
\t
Standard Delivered with
\t
1 furnace set including 1 1kg crucible,1xcrucible tongs,1xinsluation glasses,1xgloves
Products Show
Graphite Crucible
Operation Instructio

Temperature Setting

The thermostat has two digital read-outs: the bottom readout (SV) displays the setting you enter into the furnace. The top read-out (PV) displays the actual temperature inside the crucible during operation.
Temperature Setting
To set the desired melting temperature, turn on green on/off switch. Wait a few seconds; the bottom (SV) readout should show the default temperature setting of 1950°F.
To change the temperature setting, simply press the left arrow key to move the cursor to the proper desired digit and press the up or down keys to adjust it up or down. Adjust each digit to the desired setting.

Production Line

Heating Elements

Operation

 Smelting
1. Open furnace cover, put the crucible by tongs with melting material into the furnace, close Lid.
2. Turn on the red switch, press the red button to start the melting process, the round indicator light will be light. Then the thermostat control melting automatically.
IV. Pour metal liquid process.(Note:Make sure bear on insulating gloves and glasses during operation)
1. After 15minutes, setting temperature is reached.
2. Wait for 5minutes, open the lid with insulating gloves and glasses to check
3. If melted, metal liquid will appear, it not melted, go on melting.
4. Put it on the insulating tray, wait for cooling with 10 second.
5. Pour the melten into the mould, put the crucible in the tray hole.
6. Turn off red switch and green switch, close lid.
Melting ends, smelting metal can be continued processed according to the user actual demand.

Our Certifications

          CE                           ISO9001                       Test Report                    Patent


Technical Data

Gold Melting Furnace is  very useful for melting Gold, Silver, Copper, Brass and other metals with melting temperature less than 1150°C/2012F. However, it can be operated up to maximum 1200°C (Continuous operations at maximum temperature reduce the life of Heating Element). JIUCHEN Gold Melter has Digital Display to set and control temperatures. This Digital Electric Gold Smelting Furnace is an ideal supporting unit for Jewellery Casting, Gold & Silver Refining, Alloying

Customer Photo

Favorable Comment

JC-S-220-4 is faster gold melting; Stainless steel construction; Standard and custom designed; Low maintenance required; Digital Operating controls; Compact design.It is an deal model for melting bigger capacity with 5-15KG metal.


Business Seller Information
Contact Ms. Emily Peng
Whatsapp: 86-13953356036
We Chat:    86-13953356036
Skype:emilypeng2010



Shipping &Warranty

We can accept T/T,Paypal,Western Union,Escrow,the best and fast way is Paypal.
We choose DHL/Fedex/UPS usually takes about 3-5 working days to the destination,
We will send the goods within 3 working days after the full payment has been confirmed.


All the products have been tested before ship out.
All products electrical parts have 1 year warranty,including temperature controller,relay, thermocouple,heating elements have 6 months warranty,including chamber,heating coil etc.
If there is no man-made problems,we will replace or repair for you freely.


0.2023 s.