Share on (60541722540):


Mould Feature
1. Adopt imported steel P20, Germany 2316, S136 etc.
2. Each cavity and core have independent cooling system, shortening production cycle time.
3. Rational mould design to extend mold life and get high production efficiency.
4. Mirror hand polishing to create added-value.
5. Precision Machining to ensure high production efficiency & fine parting line effect.
6. Skilled Language in communication and experienced in international standard.
Name | Description |
Mould base | 45#, 50#, P20 |
Cavity and core material | H13, s136, etc. |
mold base brand | LKM , HASCO, DEM,etc. |
cavity | multi |
runner | cold |
\tMachine | 120-320T |
Plastic material | PP, PE |
Mould life | 300,000-3,000,000 shots |
Delivery time | 40-65 days |
Why choose us
Company information
Shinywell Mould is a mould manufacturer in China. We offer our expertise from initial drawing concept to product delivey Concept, development, industrialization, production, quality control, logistics and maintenance, etc.

1. Quote | According to sample, drawing and specific requirement. |
↓ | |
2. Discussion | Mold material, cavity number, runner type, payment, etc. |
↓ | |
3. S/C Signature | Approval for all the items. |
↓ | |
4. Advance | Pay 40% by T/T. |
↓ | |
5.Product Design Checking | We check the product design. If some position is not proper, we will send custo--mer a report. |
↓ | |
6. Mould Design | We make mould design on the basis of confirmed product design, and send the design to customer for confirmation. |
↓ | |
7. Mold Tooling | \tWe start to make mold after mold design confirmed. |
↓ | |
8. Mold Processing | Send processing photos to customer. |
↓ | |
9. Mold Testing | Send trial samples and try-out report to customer for confirmation. |
↓ | |
10. Mold Modification | According to customer's feedback. |
↓ | |
11. Balance settlement | 60% by T/T after the customer approved the trial sample and mould quality. |
↓ | |
12. Delivery | Delivery by sea or air. The forwarder can be designated by your side. |

Where is your factory?
We locate in Taizhou, Zhejiang, China mainland. FIFTY minutes from Luqiao Airport. TEN minutes from Taizhou Railway Station.
How about your quality control?
We have professional team to control mould quality, since we realize that quality control is the first priority to run business.
What's your lead time?
For most mould, 45 working days ( not including Chinese official holidays ) after deposit received and mould drawings approved.
What type of process do you use on mould surface?
1) Mirror polish
2)Texture
3) Plating treatment on the core and cavity.
How to approval samples?
1) You can come to have the mould test directly.
2) We could send samples & mould running video to you.
What about after service?
Spare parts delivery is available, and you can contact us at any time.
New products from manufacturers at wholesale prices