Машина для нанесения покрытий Feiyide, автоматическая вертикальная линия подъема для покрытия стойки

Share on (60548870745):


Price:

Quantity:


Product Overview

Description



Product Description


Feiyide Plating Machine Automatic Vertical Lift Plating Line for Rack Plating 


Vertical lift automatic line is made by many of the same width and length of different fixed groove, promoting the hanging device forward and fixed-point mechanical fixture and automatic control instruments etc.Hanging device with a regular drop, delay, rise and forward movement has high efficiency and can reduce labor intensity with less operators and in beautiful appearance.Applicable to coating for high quality, mass and single shape, mature technology of plating.


Hardware Automatic rack plating  production lineVertical Lift Automatic Plating Production Line(2)_


 




  1. Features:


     This kind of plating production line has short cycle,large production and running speed is adjustable, and is equipped with buffer device, make the plating parts clamping stability.


     Controlled by PLC, frequency converter and photoelectric switch, accurate positioning.




  2.   High strength and resistance to acid and alkali belt, reduce the oil production.






  1. Main parameters:


     Production cycle: 25 - 35 sec/hang




  2.  The largest plating: 800 * 600 mm  




  3. Working conditions: can work continuously 24 hours a day




  4.  Biggest hoisting: 30 kg/hang  




  5. Hoisting height: 1.2-1.2 meters




 





Related Products


Main product:


electroplating barrel


electroplating tank


electroplating production line


Preplating treatment equipment:


Polishing machine, oil removing machine, ultrosonic machine


Postplating treatment equipment:


Waste water/gas treatment plant, oven, dehydrator, dryer


Other  auxiliary equipment:


High-frequency switching power supply, rectifier filter pump, heater, temperature controller, titanium basket, industrial water purification machine, industrial chiller, etc.


plating barrel2_    DSC00765    11


     chrome plating barrel                                zinc nickel  electroplating barrel                    gold electroplating barrel


single type plating tank     semi automatic plating line    barrel plating line.jpg_350x350


    gold plating barrel                                 Automatic Barrel Galvanizing Machine      Automatic barrel nickel plating machine


semi automatic plating line   QQ20160126142107   Automatic ABS Rack Plating Production Line


automatic barrel chrome plating                  Automatic rack  plating equipment             Automatic ABS rack plating equipment


   





Packaging & Shipping


package.jpg


Packing: According to the different products and quantity are packed in a wooden container, such  as 20GP/40GP/40HQ.


Shipping:  By sea or according to the special request of the buyer.





Our Services


We guarantee 18months warranty after the equipment was passed test. Seller react during 48 hours after receive report. The warranty will be recounted if change the contract's equipment or the accessory is for repair. If the equipment stand or change after debug, the buyer can 


require return the equipment and seller have to move the equipment within 7 days.


We can provide you the following service:


1. Project design


2. Manufacturing


3. Installation and test


4. After-sale service


_.jpg 





Company Information


Dongguan Feiyide Machinery Equipment Factory is a professional manufacturing enterprise of electroplating machine which collects together R&D, production and sale. Our company aims


 to further research and development of plating equipment and provide customers with the most 


excellent and suitable service. 


_.jpg 





FAQ


1.Q: We need plating machine for ×××, could you send me a quotation? 


A: Because plating machine is always customized for different products, we’d like to send you 


quotation and make the design for you based on knowing detailed information from you first. 


2.Q: What is the necessary information you need for design?


A: The plating prosess you have had, The capacity of your per products, The material, weight,


 size, and surface area of your per product, The thickness of plating layer, Your working hours 


per day, Type of salt spray test and time, Workshop dimension and so on.


3.Q: What’s the lead time for one project?


A: It usually would take about 15-30 days for production and the time is based on specific projects


4.Q: How can I carry out my work if I plan to set up a new plating line?


A:It would be better if we could communicate with your chemical liquid supplier on the process details first. Besides, professional engineer is anso important for your project.




0.2159 s.