Share on (60576553050):

Qingzhou Sunny Fodder Machinery Co.,Ltd,Our factory has 15years history,OEM .We have the good corporate reputation.And development technology have applied the national patent successfully. The import and export license to provide convenience for foreign guests. ISO 9001 certified manufacture & CE, supplier.
Our products are not only sold all over the country, but also exported to Southeast Asia, Africa, Middle East, Brazil,Finland,Denmark, North Korea and other countries, meanwhile, we haveestablished good cooperative relations, and a strong oversea sale network have been formed. We are trusted and accepted by customers all over the world.


Product : 100A-8trays
Voltage (V) : 220/110/380
Total power (KW) : 1.5
Total capacity (KG) : 200
Daily output (KG) : 50KGS/DAY
Power consumption (degree) : 1.5
Water consumption (m3) : 0.5
Culture of sprouts : 8pcs
The weight of machine (KG): 150KGS/Set
Packaging : wooden case
The size of machine (m) :1.5×0.8×1.8 (length width height)
After the packaging size (m) :1.6×0.9×1.9 (length width height)


Product details:
Case: When inside of case the temperature high alarm. Automatic heating, constant temperature box. The internal air circulation.
Tank: temperature display. When the high temperature alarm, automatic heating, constant temperature water tank.
Sprinkler: When the water delay time will show and watering can manually.
Controller: the control system by the computer,the automatically temperature-controlled.the automatically water poured on. It is durable as well.
Ozone disinfection machine:the ozone antiseptic technology used.Sterilization, odor removal, preservation
Cycle: Seedling production cycle is 4-5 days. Not affected by weather conditions and season. Growth of bud seedling body evenly.The machine won't make bud seedling root rot.









1,Bean sprouts machine function:
Bean sprouts machine controls bean sprouts in growth process growing in the constant temperature , the permanent wet environment , need to have water , have an electricity to can, the machine will be voluntarily water-entering , the automation cuts off the water supply , the automation heats , the autocontrol temperature , the automation drench water on time, the temperature and the air humidity automatically adjust the box body all , that person can compose is that the good with bubble bean puts the machine inner inside kind and takes out mature bean sprouts coming right away.
2,What bean sprouts the machine prepares out?
That the machine can provide a permanent wet constant temperature space, makes the bean sprouts growth period shorten , long bean sprouts displays bright white , the body shape feels great kindness easy to accept the extensive consumer rude , straight.
3,Buy goods process:
We suggest that the customer is able to come to our manufacturer pay a visit to examination first, if unable in person arrival, also can entrust the domestic kinsfolk and friends to come to inspect. The abouchement suggesting that general money for buying or selling goods abouchement arrives at my company's company account .
4,The machine installation, is put into use and defends:
The machine installation simple , only, needs an electricity to receive water , receives to can. While delivering goods be able to follow the machine assembling the drawing sheet and the operating instruction manual , up video record and so on..
5,Specifically for abroad, customer's after-sale service is how to be in progress?
Abroad customer, may match mean document easy to give to for free especially when delivering goods we , the machine component all adopt "socket style " to insert be OK , simple installation once. Country's voltage and Chinese voltage are different because of major part , we suggest buying a transformer specifically for this customer , again, order one controller , reserving.
6,Transportation about the goods:
My company owns international import and export right and relevance international attestation , the freight owning self acts for a company , can provide a freight to the entrance service.
wooden package and LCL loading and full container loading
Delivery Time | Within 5-7 working days after receiving clients’ payment. |
Payment Terms | T/T, L/C, D/P, D/A, Escrow, Paypal, Western Union |
Packing | a. Machines are wrapped in plastic film first before packing, which is to avoid moisture on the sea. |
Quality Guarantee Terms | Quality guarantee term is for one year. Malfunctions which are caused by machine self and quality will be responsible for our manufacturer. Other malfunctions which are caused by operation mistakes, man-made problems, etc will be responsible for clients-self. |
Our Services
Service | All produts purchased in our company are guaranteed to keep in good repair for two years. If quality problems happen in guarantee period, our company will maintain for free. a, Before sending the machine, we will test and adjust, so you can use directly when you get it. Additionally, our company provides technical support and fittings for life. After-sales service isn't restricted by time and we will solve your problems in time. If you are caught in some problems when using our products, welcome to contact us at any time. a, Any problems occur while using, professional advice will be offered. |

New products from manufacturers at wholesale prices