Price:RUB 2.46 - RUB 15.34

Quantity:


Product Overview

Description

SA EIFS 2 Fastening System  

 The insulation Fastener is made of steel nail and plastic washer. 

It can be applied on the wall such as claybrick, normal concrete, concrete block, light-concrete or pore-concrete-block, aerated concrete etc

 

Product Packaging                

Bags or cartons

Standard: JG158-2004, JG149-2003

 

Product Advantages

·Suitable for all kinds of wall

·High pull-off strength for a higher security of the system

·Low thermal conduction addition value to avoid thermal bridge

·Galvanized layer on the steel nail to protect the nail from alkali

 

Field of application

It is fixed on the position where there is significant wind-suction-force or if the height is more than 20m or if the finishing coat is tile etc

  

Remarks

• Start drilling after sufficient hardening of the glue (min 24h later)

• Clean the drilled hole

• Make sure that not any damage to the thermal insulation layer or substrate were made during fixing the anchor

• Make sure that the depth of drilling is deeper than 40mm and the anchoring depth is min. 30mm

• The top of anchor can not be protrudent out of the surface of the thermal insulation layer

• For the tile system the anchor must be fixed through the thermal insulation layer, the alkali-resistant glass-fibre-mesh and fresh base coat; for the plaster system the anchor can fixed directly through the thermal insulation layer

 

Arrangement diagram  of anchor fixing (1.   4pcs/m2   2.  6pcs/m2)

  anchor .jpg

 

Product specification

ANCHOR TECHNICAL.jpg

Tools

Percussion drill, Hammer

 

Substrate requirement

The substrate should be sound, dry, flat, clean and durable

 

Application environment

Temperature:5°C~35°C

Avoid raining, high temperature and frost

Avoid direct sunlight and class 5 wind

 

SA EPS system is a lightweight, low density system employing expanded polystyrene insulation with adhesive and mechanical dowel fixings

Screw and fastener is a part of SA - external wall Insulation systems of external building walls,The finishing coat can be tile 
  EPS TILE LAYER.jpg
Typical EPS System Build Up
 
1. Substrate (Concrete etc.)
2. Adhesive for polystyrene
3. Insulation Foam Board
4. Base coat
5. Mesh reinforcement
6. Fastener
7. Basecoat
8. Flexible Tile Adhesive
9. Wall Tile
10. Flexible Tile Grout

 

0.2066 s.