Share on (60585149276):
Rug rollers double bed frame folding steel bed frame with 6 legs
Size: T/F/Q wither center legs;
Weight: 21.5 LBS
Quantity per 40'GP: 1,980 pcs
Lead time for a container: 15-25 days







Our advantages:
1.Professional production site with advanced metal processing;
2.Strong Expertise and Technical in Steel furniture developing & manufacturing ;
3.Accountable quality control;
4.High level OEM furniture parts;
1.Does your company accept customization? Are you able to produce products base on our samples or drawings?
A:We have our own factory and excellent design team, and we accept OEM/ODM.
2.How does your factory do regarding the quality control?
•We manufacture per customer approved samples/drawings;
•We design and conduct various tests for function/finish/packaging/assembly;
•Inspection for every shipment by our own QC team;
3.Can we use our own logo and size ?
A:Yes. We can do OEM based on fixed QTY according to customer's requirements.
4.How long is your delivery time?
A: Generally it is 10-15 days if the goods are in stock. or it is 25-35 days if the goods are not in stock, it is according to quantity.
5.Can l mix items in one container?
A: Generally we try to satisfy all request from clients, you can mix 5 items, if you want mix more, pls allow us to check it again.
6.Can I get some samples?
A: Yes, We are honored to offer you samples for quality inspection.
|
If you have another question, please feel free to contact us as below: |
New products from manufacturers at wholesale prices