water spraying bottle cooling tunnel for hot filling production line

Share on (60617267484):


Price:

Quantity:


Product Overview

Description


water spraying bottle cooling tunnel for hot filling production line

key words:cooling tunnel,water spraying bottle cooling tunnel,hot filling production line

1.png2.png3.png

 

water spraying bottle cooling tunnel for hot filling production line

Machine composition and operational principle

This machine is composed of moving link joint, machine body, water circulation system and electric controlled system. The frequency conversion motor brings along the square shaft to circumstance through reducer and the chain. When the cooled bottles enter the plastic link joint, they will be in the spray section and arrange neatly automatically. There are atomized nozzles in the upper zone to the cooling area. Hot water entering through spray pump to warm the bottles. Then the water flows into the water tank and re-heating for recycling operation

water_spraying_bottle_cooling_tunnel_for_hot_filling_production_line.jpg

 

water spraying bottle cooling tunnel for hot filling production line

Main characteristics

The speed of the belt can be changed by the transducer.

All the spray heads are made of stainless steel. And the water sprayed from every nuzzle is equal.

Technical parameter

 

Model

SF-W5

Cooling capacity

2000-5000BPH

Conveyor belt speed

0~1.25m/min

Cooling effective area

5*1.5M

Cooling time

Adjustable, the main motor timing with frequency conversion

Total power

N=30kw

Dimension

5000×1500×1650mm

Weight

3000kg

4.png

water spraying bottle cooling tunnel for hot filling production line

Related machines

SANOFI PET blowing machine

 

5 gallon PET  blowing machine                              SF-B1 PET blowing machine

 

23.jpg 36.jpg

 

 SF-B3 PET blowing machine                                SF-B4 PET blowing machine

 

.jpg 10.jpg

 

 Automatic PET blowing machine                                             Juice PET bottle  blowing machine

 

13.jpg 31566.jpg

 

juice water filling machine                                               

 

 .jpg

 

water treatment

 

 
 
371692587C7216153F70843BFE0D19FB.png

 

water spraying bottle cooling tunnel for hot filling production line

Warranty

Payment terms and installation

1. Delivery time: 30 working days after the receipt of deposit from buyer.

2. Voltage and frequency: 380V/50Hz, or 220V/60HZ, 3phase, 4 wires

3. Payment: 30% of total value will be paid by T/T as deposit, 70% balance will T/T before shipment.

4. Installation: Before shipment, machines will be tested by our technicians to make sure they can work well. Our technicians will be sent to user’s factory to install the machines and train workers. The buyer will pay for our technicians’ return tickets, meals, accommodation and the salary for100 USD per day.

 

Warranty

1.The supplier will warrant for18 months after the acceptance of the equipment, and will warrant for 18months for the control system. When there are faults with the equipment, the supplier will communicate with the buyer to remedy the trouble in time when informed;

2.When warranty time is past, the supplier will supply broad and favorable technical support and after service for life.

 

Packing and transport

The package adopts export special wooden case; it is suitable for long distance transport, damp proofing, and rust prevention, shockproof and so on. And also it suitable for sea, land transport and entirety lifting.

 

water spraying bottle cooling tunnel for hot filling production line

Packaging & Shipping

635925210_307.jpg

 

water spraying bottle cooling tunnel for hot filling production line

FAQ

Q1:Are you a trading company or a manufactory?

A1:We are a manufactory,can give u best service .

 

Q2:What’s your guarantee or the warranty of the quality if we buy your machines?

A2:We offer you high quality machines with 2 years guarantee . we will give u spare part free in 2 years

 

Q3:When can I get my machine after I paid?

A3:We will deliver the machines on time as the date we agreed both side.

 

Q4:How can I install my machine when it arrives?

A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.

 

Q5:How about the spare parts?

A5:After we deal down all the things , we will offer you a spare parts list for your reference.

water spraying bottle cooling tunnel for hot filling production line

 


0.1904 s.