Share on (60622575725):
| Product Name | Ceramic raised floor |
| Color | Ivory White/ light yellow |
| Size | 600x600mm |
| Thickness | 40/45mm |
| Feature | Anti-static / soundproof |
| Application | Office/ Data center |
| Product Keywords | anti static steel raised floor data center with ceramic covering |
Description:
The dimension is 600*600*40 According to the consumers’ requirements the surface can be laminated with granite, marble, various kinds of tiles, etc. it is a kind of panel especially designed for intelligent building, especially in characters of beauty, nature, durability and convenience for wiring, After installation, wires can be laid and maintained as long as lifting the panel lightly, which gives customers much convenience and enjoys high reputation.
Features:
1. Antistatic, the system resistance of this ceramic tile access floor is stable Besides,
2. It has been monitored by national supervision unit, and each index can reaches or exceeds standards of GB-50174-93and QFT03-9 etc.
3.Anti-pollution: this kind of tiles reduce pores and bores of pores, besides, special coating is coated on the tiles which can prevent polluted sap into the tile, therefore, it solves a long-term problem that ceramic polishing tiles are easy to be polluted.
4. Non-radiation: the tile has passed tests by national construction material testing centre.
5.It is non-radioactive, safety, reliable and protects health. Therefore, its the perfect substitute for natural stones.
6.High performance of decoration: its colors are various
Application
Wide range All manner of computer room, network service room monitor control center, electronic workshop, clean room, etc, and occasions which require on antistatic and air conditioning
And 5 class office Security Union Plaza ,Futures Trading Building , and the place demand cabling and wiring .
nstallation And Maintenance:
1.Requirements to laying site:
1)The laying of antistatic raised access floor shall be carried after the indoor civil engineering and decoration and finished.
2)Ground must be flatness,clean,dry and there shall be no any sundry or dust on it .
3)The construction of cable electric appliance,air pipeline and AC system to be arranged under floor surface shall be finished before the installation of floorings.
4)The base of heavy equipment must be firmed,equipment is installed on the base and the base height shall be align with the upper surface of the floor.
5)The construction site must be equipped with 220V/50HZ power supply and water supply.
2. Tools for installation:
Infrared ray level instrument, large push cutter, aluminum alloy ruler, level bar electric hand drill, Mini type marble cutter, pulling nail gun, wire-cutter, steel ruler, nail, pencil, suction disc machine, adz-eye hammer, spanner, screwdriver, floor glue, tool bag ,broom.
3. Construction Procedures:
1)The flatness of floor and the verticality of wall are carefully checked. If any part is found not to be consistent with construction requirements,it shall be reported to relevant department of Part A.
2)The horizontal lines are pulled and fixed and the installation height of floorings is drawn on the wall using ink line.The floor panels shall be on a same horizontal plane. The indoor length and width are measured. The reference position of laying shall be selected properly in order to decrease the cutting the floorings.
3)The pedestals to be installed are adjusted to a same height as required,and then placed on the decussation position of the grid lines.
4)Stringers are fixed on the pedestals using screws, and every are on a same plane and mutually perpendicular.
5)The floor replaced on the assembled stringers using board sucker.
6)If the rest distanceto the wall is less than the length of floor , the floor can be cut into adequate size before installation.
7)During the laying of floorings,blister gradienter shall be used for levelling and the height of floorings can be adjusted through pedestal.
8)In case that heavy equipment is placed in machine room,additional pedestal shall be installed under the equipment base in order to avoid the deformation of floorings.
9)If it is necessaryto cut or open hole on the raised floor,electrical drill shall be used to open in order to avoid the rupture of veneer.
3. Acceptance criteria for the laying of floorings:
1)Either under the floor or the surface of the floor shall be cleaned,to avoid the dust .
2)There is no search and coating peeling on floorings,and regulas are not damaged.
3)The whole of the floor after laying shall be stable and firm. There is no sound and the feeling of shaking when walking on the floor.
4)The regulas must be in a line,and the displacement of adjuacent regulas shall not be more than 1mm.
5)The height difference of adjacent floor panels shall be more than 2 mm.
4.Maintenance Requirements:
1)It is forbidden to directly use sharp tools to carry out construction on the floor surface in order to avoid the damages to the appearance and antistatic performance of flooring surface.
2) During application, no person is allowed to jump onto the floor from high position, and it is forbidden to crudely remove equipment as such operation may damage the floor.
3)When equipment is moved on the antistatic raised access floor,it is forbidden to directly pull the equipment on floor as it may scuff the floor,the equipment shall be lifter before moving.
4)When heavy equipment is to be installed in machine room,it ahall directly place the heavy equipment on floor as deformation may be long-term load bearing.
5)To repair the equipment under the floor, panel lifter shall be first used to remove flooring.It is forbidden to use sharp tools to crudely dismantle and assemble the flooring.
6)During maintenance,dust collector or mop can be used to keep the floor clean. Particularly, measures shall be taken to avoid sprinkling liquid onto floor.
7)Antistatic wax can be polished on the floor surface, in order to protect the floor and ensure the application effect in long time.
5.Opetaing Environment:
The temperature in the room to be laid with antistatic raised floorings shall be 15-35degree,and the relative humility is 45%-75%RH.If the humidity of the computer room is low for a long time,there may be cracks on the floor surface and the strength and the thickness of attaching veneer shall be increased therefore.
Our Services:
Whether you choose us or not finally,any questions about the raised floor systems you can feel free to ask us.We will take all our customers as our best friends ,so the best services will be provided at any time.
Company Information:
Changzhou Basic Computer Room Equipment.,Ltd is a new company ,but we have professional workers and sales team,not worse than other suppliers .What we can do is to improve our productss quality and services. Welcome to send us inquiries !




Standard export wooden pallet packing.
5-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

Changzhou Basic Computer Room Equipment Co., Ltd founded in 2016.We specialize in raised floor and electrical floor box with good quality and best service.

New products from manufacturers at wholesale prices