CR HR Steel Coil Cut to Length Line Equipment Stainless Steel Coil Cross Cutting Machine Servo Drive Motor

Share on (60625742885):


Price:

Quantity:


Product Overview

Description


1.jpg










 Information 








































MaterialSS,CR,HR,GI,AL,Copper etc.Coil IDΦ508
Length arrarge500-1250Coil OD≤Φ1600
Coil max weight15TLength accuracy≤±0.5
Power100kwDiagoral tolerance≤±0.8
Speed60m/minFlatness≤1.5
Thickness0.3~1.5mmFloor space24*8*2m

 










 Display 

 


full linedecoilerguiding&pinchconvetorstacking device18009


 











Item

1. Backup saddle


2. Loading coil car


3. Support arm


4. Hydraulic decoiler


5. 19-roller leveler


6. Loop pit and bridge


7. Pinch/NC length device cum PVC device


8. Servo cross shear


9. Conveyor belt


10. Stacking device


11. Unloading roller


12. Hydraulic /pneumatic/lubrication system


13. Electric control system



More Products 












































































































































Model Coil width (mm)Coil max weight (T)Power (kw)Speed (m/min)Thickness (mm)Floor space (m)
2.0*650150-6506961800.2-2.011*4
2.0*850200-85010961800.2-2.011*4
2.0*1000300-1000151201800.2-2.011*5
2.0*1250500-1250151601800.15-2.012*6
2.0*1600500-1600202402200.2-2.022*7
3.0*650200-650151801500.2-2.022*7
3.0*1250500-1250152051800.3-2.7522*6.5
3.0*1600600-1600202301200.4-3.023*8.5
4.0*1600800-1600252201200.5-4.025*7.5
6.0*800200-80015220601.0-6.015*5.5
6.0*1600800-160025220501.0-6.028*10.5
9.0*1600800-160025265402.0-9.028*10
12*20001000-200035285203.0-12.036*10
16*22001000-220035285204.0-16.036*10

 









Our Company



4.jpg


 









Our Advantages



5.jpg


 


6.jpg


 










 Packaging 

7.jpg


 


8.jpg


 


9.jpg


 










 Contact Us 




























Tel+86-757-8108 1122
Mobile+86-13929919722
Fax+86-757-8108 1116
Emailhonjiamachine@gmail.com
webwww.honjia-machine.com
Address

#1, Hongying Industrial Zone, Tangtou, Shishan Town, Foshan,


Guangdong, China (Mainland)



 










 FAQ 








 


Q1:How much is your machine?


A1:Sorry, we cannot answer this question before understanding your exact demand and re- quirements. For example, if you ask: “how much is an APPLE iPhone?” It’s impossible for any salesman to answer. Basically we have to tell them exact model 3/4/5/6/7/8/X or plus, 32/64/128/256G, etc.


 


Q2:How can I know the design and proposal of the machine line?


A2:Generally speaking, we need to know:


(1)Machine type: slitting line or cut to length line (normal CTL or flying CTL) .


(2)Raw material info: such as thickness/width/master coil weight/coil ID/coil OD.


(3)Final product info: such as slit nos (at thinnest and thickest)/min. strip width/precision and tolerance/exit coil ID, etc.


such as target length to cut, length tolerance, diagonal tolerance, etc.


4)Line speed: normal type or high speed type


5)Line type: normal type or compact design (for example, same function with single loop or double loops)


6)Electrical system: China mainland/Taiwan/Japan/European brands


7)Optional functions: such as paper collector/film coating/burr masher/digital display/special loading and unloading designs, etc.


 


Q3:How long will you send the proposal and offer?


A3:We will need about 3~7 days to design the proposal upon collecting all details of the ab- ove mentioned info necessary.


 


Q4:When will you tell me the price?


A4:After confirming all detailed configurations of the machine line, that we are able to make offer for it.


 


Q5:How long do you need to produce the machine?


A5:We need about 3 months to produce light gauges; about 4~5 months to produce the me- dium gauges; 6~10 months to produce heavy gauges.


 


Q6:What pricing terms to you accept?


A6:We accept 30% TT as deposit and 70% TT before delivery. 30% TT as deposit and 70% LC terms is also considerable.


 


Q7:How long do you need to install and commissioning the machine line?


A7:Light gauges, we need about 10~14 days; Medium gauges, we need about 28 days; He- avy gauges, we need about 1~2 months.


 


Q8:How many people will come to install and commission the machine line?


A8:Light gauges, we will send 1 engineer, with the assistance of your stuff in your workshop. Medium/heavy gauges, we will send 2~3 engineers, with the assistance of your stuff in your workshop.


 


Q9:Do I need to pay extra charge for installation and commissioning?


A9:We are not charging extra fee for it, but the buyer is responsible for the round trip tickets/ visa/local transportation/hotels of our technicians as well as USD50/day/person allowance only.


 


Q10:What about the warranty of your machine?


A10:We offer 1 year warranty for our machine lines starting from the acceptance date of ins- tallation and commissioning.


 


Q11:How long do you need to prepare the foundation drawings for the machine line?


A11:Upon receipt of 30% deposit, we need about 30~45 days to prepare the foundation drawings for you.



0.1861 s.