Lead Ore Smelting Plant Lead Refining Melting Kettle Lead Pots EB4109

Share on (60637081539):


Price:

Quantity:


Product Overview

Description


     Lead Ore Smelting Plant Lead Refining Melting Kettle Lead Pots EB4109

_01.jpg

Lead-Pots-1.jpg

_04.jpg

Product Description:

 

Product Name

Lead Ore Smelting Plant Lead Refining Melting Kettle Lead Pots EB4109

Service

OEM Service

Quality Control 

100% Inspected

Hardness

20~50HRC

Packing

Wooden  

Application

Industry

 

The Trends for Material Selection:

Due to obvious advantages in terms of service life,maintenance and cost-efficiency, cast steel has been becoming more significant in the melting pot construction over the last few years against both materials, spheroidal cast-iron and lamellar graphite cast-iron. In comparison with other materials, cast steel offers excellent repair possibilities as it is well-suited to welding.

Detailed Description:

Material Grade: Alloy Steel, Carbon Steel;

Quality Level: As per National Standard & International Standards.

Production Process: Sand Process Heat-treatment Process

Including machining process,such as drilling and tapping holes.

Special Features:

1. We can make big size alloy steel castings with Sodium Silicate Sand Process.

2. We can supply finished alloy steel castings with heat-treatment and machining process.

3. We can produce alloy Steel castings as per ASTM A27, GB/T 20878,DIN 17440,DIN 17224, AISI,ASTM,JIS SUH35,NF A35-572/584,BS970,BS1449,ISO 683/13.

4. The biggest steel castings we can achieve so far is 300 tons per piece.

5. Material Grade for Slag Pot

 

Chemical Composition

C (Max)

Si (Max)

Mn (Max)

S (Max)

P (Max)

ZG200-400

0.2

0.5

0.8

0.04

0.04

ZG230-450

0.3

0.5

0.9

0.04

0.04

ZG270-500

0.4

0.5

0.9

0.04

0.04

ZG310-570

0.5

0.6

0.9

0.04

0.04

ZG340-640

0.6

0.6

0.9

0.04

0.04

_06.jpg _07.jpg_08.jpg_09.jpg

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment. irrevocable LC at sight.


0.1883 s.