Share on (60647286002):
MY COMPANY

Products Description:
Internal concrete vibrators use the pendulum principle. 3,000rpm of the drive unit translates via the flexible shaft into 12, 000 vibrations per minute in the poker head. The low output speed ensures high reliability and extended service life. It can be used between two types of drive units (interchangeable): electrical motor and petrol or diesel engine drive unit series, with 7 standard poker diameters. The vibrator poker is top of the range poker head suitable for professional application.
DV serials vibrator poker 4~12m length, Bar diameter 28mm, 32mm, 38mm, 45mm, 50mm, 60mm, 70mm
Model | Vibrating Head Size | Vibration (V.P.M) | Vibration Amplitude (mm) | Flexible Shaft Diameter | Rubber Hose Diameter and Length |
DPV-28 | 28mmx47cm | 10,000~15,000 | 0.9 | 8mm |
|
DPV-32 | 32mmx47cm | 1.1 | 10mm | 30mmx4m~6m | |
DPV-38 | 38mmx47cm | 1.6 | 12mm | 32mmx4m~6m | |
DPV-45 | 45mmx47cm | 2.0 | 12mm | 32mmx4m~6m | |
DPV-50 | 50mmx47cm | 2.2 | 13mm | 32mmx4m~6m | |
DPV-60 | 60mmx47cm | 9,000~12,000 | 2.4 | 13mm | 32mmx4m~6m |
DPV-70 | 70mmx47cm | 2.6 | 14mm | 36mmx4m~6m |
Packaging & Delivery:


2.Pictures of different products
![]3DR5%$ZYGURYT5I4LKPJ(U_.jpg](http://g03.s.alicdn.com/kf/HTB1HmfVRFXXXXcBXpXXq6xXFXXXy/230236679/HTB1HmfVRFXXXXcBXpXXq6xXFXXXy.jpg)

3.Certifications

4.Production Line


5.Welcome To Contact Us
NAME:Tony
Mobile:+8615763532377
![]()
Address: Yanggu Industrial Park, Liaocheng City, Shandong Province, Liaocheng, Shandong, China
Zip code :252300
6.OUR PRIDE

7.
1) Why choose us?
Professional supplier on flexible shaft products;
Lowest factory price with good quality;
Sample to check quality;
Introducing advanced technology in Germany
Meet safety standard for Europe and USA;
2) What is advantage on quality?
Introducing advanced technology in Germany
The factory has many years of manufacturing experience
In China many times to win the integrity of the company honor
3) What is sample time and production time?
Existing sample:2-3days;
Customized sample:5-12days;
Production time:5-30days.
New products from manufacturers at wholesale prices