124pcs Repairing Motorcycle Mechanic Limit Switch Tools Box Set

Share on (60649450592):


Price:$79.00 - $85.00

Quantity:


Product Overview

Description



Product Description




20x 1/4Dr. Socket
4-5-6-7-8-9-10-11-12-13mm,5/32,3/16,7/32,1/4,9/32,5/16,11/32,3/8,7/16,1/2"
11x 1/2Dr. Socket
20,21,22,24,27,30,32mm,15/16",1",1-1/16",1-1/4"
8x 1/2"Dr. E Socket
E10,E11,E12,E14,E16,E18,E20,E22
2x Ratchet Handle
1/2 ,1/4Dr.
1x Spinner Handle
1/4"Dr.
2x Universl Joint
1/2 ,1/4Dr.
3X Extension Bar
1/2Dr. 125mm&250mm,1/4Dr. X50mm
1x Three Way
1/2"Dr.
2X Spark Plug Socket
1/2"Dr.16mm&21mm
2x Coupler
1/2x5/16,1/4x1/4
4x Impact Socket
1/2"Dr.17-19-21-23mm
27x 5/16"Dr.Bit
30mm(L),SL:4-5-5.5-6-6.5-7-8mm,PH:1-2-3-4,H:4-5-6-7-8mm,T:20-25-27-30-40-45-50,PZ:1-2-3-4
19x 1/4"Dr.25mm(L) Bits Socket
SL:4-5.5-7mm,PH:1-2-3,H:3-4-5-6mm,T:8-10-15-20-25-30,PZ:1-2-3
4x Hinged Socket Wrench
8x9,10x11,12x13,14x15mm
10x Combination Wrench
8-9-10-11-12-13-14-15-16-17mm
4x Screwdriver
3x0.5x75mm,5.5x1.0x100mm,PH0X75mm,PH1x100mm
1x Combination Pliers
7"
1x Long Nose Pliers
6"
1x Diagonal Cutting Pliers
6"
1x Groove Joint Pliers
10"




Related Product




Company Profile




Factory




❈ A professional manufacturer of tool chest,roller cabinet,work bench and power tools products, strategically located in one of the busiest sea port in China, Ningbo city.
❈ We are certified ISO9001:2000 Quality System manufacturer that produces quality products and to serve our customers better. 

❈ Our expertise and dedication are your guarantee of quality and reliability.





❈ We’re proud of our reputation for excellence, and dedicated to continually testing, designing and improving our products to ensure quality and maximum function.
❈ Maintaining our standing of being the world's best at what we do is important to us and what you expect from a name like fixman®



Exhibition










Transport




FAQ


Q1. Are you a manufacturer or trading company? 

A: A professional manufacturer of tool chest,roller cabinet,work bench and tool products

Q2. What is the lead time? 

A: Normally speaking, it asks for 35 days for mass production except during observed holidays. 

Q3. Do you develop any new designs every year? 

A: More than 100 new products are developed each year. 

Q4. What’s your term of payment? 

A: We prefer to T/T, 30% deposit and balance 70% paid off before shipment. 

Q5: Where is the Distribution of product's industrial base? 

A: Ningbo is the main base in country, also including Jiangsu, Hebei, and Shenzhen.





0.1486 s.