High Quality Heavy Duty Hotel Bellman Carts Metal Baggage Luggage Cart Luggage Trolley

Share on (60656547571):


Price:RUB 11,300.69

Quantity:


Product Overview

Description

Guangzhou Hoza Metal Product Factory
8 Years+ Production Experience
High Quality Heavy Duty Hotel Bellman Carts Metal Baggage Luggage Cart Luggage Trolley
Place of Origin Guangdong,China
Brand Name HZ
Model Number HZ-D007C
Capacity 1050*560*1910MM
Product name Hotel Luggage Trolley
Usage Hotel
Material Stainless Steel
Size 1050*560*1910MM
Load capacity 200kg
Wheel Strong Rubber Wheels
Packing Air Bubble Film+Wooden Frame
Color Support Custom
Logo Customer's Logo Accepted
MOQ 5 Pcs
Raw Materials
 
CNC Cutting
 
Bending
 
Punching
Welding
 
Polishing
 
Cleaning
 
Packing
Transport mode:  Ocean . Road  . Air 
Payment term: 30% T/T, L/C at sight
Product Category

PRODUCT CATEGORIES

→ VIEW ALL
 
Luggage Rack
Outdoor Recycle Bins
Single/Ashtray Bin
Indoor Recycling Bin
Hosekeeping Trolley
Luggage Cart
Service Trolley
Storage Cage Trolley
Speech podium
Crowd Control Stanchion
Cigarette Ashtray Stand
Coffee/Tea Table
Company Information

OUR FACTORY

Guangzhou Hoza Metal Product Factory was founded in 1997 and covers an area of 8000 square meters with about 150 staff members; our company is located in a beautiful city-Guangzhou, Which is near Shenzhen, Hongkong and Dongguan city. We specialize in the development production and sales of kids hotel products, service trolley, wastebin, wooden household products, OEM request is also welcomed.

Our products are strictly in accordance with international inspection standards.We adopt solid wood, Plywood, MDF as our raw material and use lead-free painting, silk screen, hand drawing, paper laminate, and melamine finishing.

MAIN
MARKETS

America,most of Europe countries,Southest of Aisa.

All our products are welcomed by many customers.

We are factory supplier and the client can be wholesaler or retailor.

 
Our Partners

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

2) How can I get a sample to check your quality?

After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.

3) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.  
You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 45-60 days. 
We need 15 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

7) How can I get a sample to check your quality?

After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.

8) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.  
You can use your own express account or prepay us if you do not have an account.

9) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 45-60 days. 
We need 15 days to prepare all the stuff then 30 days for manufacturing.

10) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

 

0.2077 s.