Share on (60670392487):
FS series is mainly used for light industry, while RS series are mostly suitable for low temperature and medium temperature hot boiler, hot wind generator or steam boiler, oil guiding heating boiler, etc.
| \t | |||||||
| \t | \t | \t | \t | \t | \t | \t | |
| \t | \t | ||||||
| \t | \t | \t | \t | \t | \t | \t | \t |
| \t | \t | |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | |
| \t | \t | |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | \t |
| \t | \t | |
| \t | \t | |
| \t | \t | \t |
(1)Reference conditions:Ambient temperature 20°C - Barometric pressure 1000 mbar - altitude 100 m a.s.l.
(2)Pressure at test point16(A)p.3 with zero pressure in the combustion chambre ,with open gas ring2 (B) p.7 an maximum burner output.
(3)Sound pressure measured in manufacturers combustion laboratory ,with burner operating on test boiler and at maximum rated output.
| \t | |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
1,Easy operation;
2,Convenient assembly for all parts;
3,Efficient maintenance, cleaning and inspection;
4,Critical spare parts adopt renowned brand;
Our gas burners can be divided into two types which are single-stage and dual-stage according to regulating control method.
After single stage gas burner is ignited, only one stage heating power works, which cannot be adjusted. The heating power of four models ranges from 470kw to 1279KW.
The dualstage gas burners have two stages heating power. When ignited, the 1st stage starts working; as the load keeps increasing, the 2nd stage starts working, too, whose heating power ranges from 1279kw to2290kw.
The FS and RS series gas burners are driven by natural gas, coal gas, liquefied petroleum gas, etc.
| \t | |
| \t | \t |
| \t | \t |
| \t | \t |
Devices and Components:
key parts and components are imported from original supplier, top quality devices to match the design and cost down.
Delivery time and Payment term:
For sample orders, 10 days after receiving payment; for bulk order larger than 10 pieces, 7-15days after receiving initial payment, based on different item size.
Western Union payment or T/T in advance for sample orders;
For bulk orders, 30% T/T down to start production, while 70% balance before shipment.
1, We can offer small quantily
2, We can offer fast delivery
3, We can offer you best price
4,We can offer you good quality
5,We are professional manufacture
New products from manufacturers at wholesale prices