Share on (60684270890):
High output quail egg breaker/quail egg breaking machine/egg shell breaker
Working principle:
Through the motor rotation driven gear operation, driven by the mechanical up and down the movement of the pad and the hose on the turn, resulting in friction from the quail eggs from the surface of the shell tear to achieve the effect of shelling.

Operation Description Method:
1.Should be placed 2-3 days (summer), 4-5 days (winter) fresh quail eggs.
2. Fry the water to about 85 degrees into the eggs, while stirring the eggs roll. Fierce fire cook.
3. After picking out the bad guys cooked, slow fire for 15-20 minutes after the eggs out, into the cold water through the cool.
4. Wait 15 minutes after the removal of eggs, into the shelling machine shell, and then placed in cold water soak.
5. Turn on the power and water, first open the water, then open the machine, control the water flow medium.
6. Pour the eggs into the shell box and start the shelling operation.
7. Pay attention to power safe, saving electricity.

Model | Voltage | Power | Weight | Capacity | Dimensions |
220v | 0.5kw | 100kg | 300kg/h | 600*600*800mm |



|

1.Reply all your questions within one hour on workdays.
|
2.We have our own factory,can customize the product according to your needs.
|
3.We have 10 years export experience,can supply the service of production,inspection of goods and transport .
|
|
5.warranty time is for one year,professional timely advice and spare parts will be offered all the time.
|
1.Q:Are you factory or trading company? A: We are the manufacturer. |
2.Q:where is your factory and how can i visit it? A:our factory is located in Shandong province,you can fly to weifang city airport ,we can pick you from there or your hotel. |
3.Q:How can i get the quotation? A:You can leave us message or send us the inquiry with your requirement,we will reply you within one hour on weekdays. |
4.Q:Can I make the customized products? A:Yes,you can contact us with your requirements we can also print your logo on the products. |
5.Q:what’s the delivery time? A:We need about 7-15 days to produce the goods,then make the wooden package and arrange the transport. |
New products from manufacturers at wholesale prices