concrete lift shaft formwork

Share on (60693346324):


Price:RUB 16,679.96 - RUB 18,954.50

Quantity:


Product Overview

Description

concrete lift shaft formwork     (Inner Form)                             

Elevator Shaft platform.jpg

Application                                                                                

Inner formwork for High-rise building lift core (shaft)

 

Advantages:                                                                              

* Safe, base can bearing 4 Ton, and there is  shaft cover. 

* Lightweight  , aluminium combine with plywood

* Easy handle: shaft corner make the system

    contraction-lift- expand ,

* Accurate size & fair concrete finish.

 Components                                                                            

Quantity

Material

Section size(mm)

Height (mm)

4pcs

aluminum alloy

250*250*350

1600/2400/3000

2.Shaft plywood panel

quantity

Material

Size

Thickness(mm)

4pcs

Plastic coated plywood

customize

15

3.Lift shaft frame

Quantity

Material

Size

height (mm)

4pcs

Aluminum alloy

customize

1600/2400/3000

4.Lift shaft base

Quantity

Material

Size

1pcs

Film face plywood & aluminum alloy

customize

5.Connecting claw

Quantity

Material

All-purpose connecting part

24pcs

Galvanized steel

6.Base stand reserving box

Quantity

Material

 One-time use accessories

4pcs

ABS plastic & tie rod

7.Crane hook

Quantity

Material

Attach on the top of shaft frame for crane lifting.

4pcs

Galvanized steel

 

 

Feedback from the jobsite                                                         

 

 

elevator shaft.png

 easily installation

QQ20160723095321.jpg

 

Zhang ( CSCEC Branch 3 ): It's fantastic , shorten the period of one storey from 13 days to 5 days.

 

 

Storage & Package                                                                    

IMG_20170507_135519.jpg

1. Please store the product in dry clean indoor environment while not using, exposing the product to the climate may lead rust, scaling and damaged.

 

2. For assuring better finish and easier dismantle, please apply release agent on column panel before assembling and pouring.

 

Factory & Workshop                                                                     

IMG_7154.JPG

CERTIFICATION                                                                          

CE.jpgISO.jpg

 

Related  Products                                                                       

DPP_0010.JPGDPP_0012.JPGDPP_0014.JPG

IMG_7202.JPGwall form.JPG

   CONTACT  US                                                                        

More info:   www.scformwork.com   or  www.squarecircleformwork.com

Contact us:   +86 539 7758032

Add: Ehuang road, Lanshan district,Linyi, China  276000

 

 

0.2079 s.