Share on (60694396607):

Turbo Mill Application:
Turbo Mill is now widely used for mineral fillers, ceramic fillers, animal food, chemical products, food and
surface treatment, coating etc.
| Ⅰ. EPC Contracting | ||||||||||
| i. | Technology | Hosokawa Alpine technology and Omya technology | ||||||||
| ii. | Experts/Consultant | Mr. H. Horlamus -- former engineer-- Hosokawa Alpine | ||||||||
| Mr. Victor Evele -- former engineer-- Omya | ||||||||||
| iii. | Experience | over 20 years | ||||||||
| iv. | Application | Minerals, Chemicals, New Materials, Pharmaceutical Materials, Food/Health Care Products, Recycled Materials | ||||||||
| v. | Supply | consultancy, testing, project design, machines, commissioning and training service. | ||||||||
| Ⅱ.Machine Supplier | ||||||||||
| i. | Fluidized Bed Jet Mill | ix. | Turbo Classifier | |||||||
| ii. | Spiral Jet Mill | x. | Multi-wheel Classifier | |||||||
| iii. | Air Classifier Mill | xi. | Dynamic Classifier | |||||||
| iv. | Impact Mill | xii. | Jet Classifier | |||||||
| v. | Vibration Mill | xiii. | Particle Surface Coating Machines | |||||||
| vi. | Ball Mill | xiv. | Particle Shape Modification System | |||||||
| vii. | Grinding System | xv. | Waste PCB Recycling System | |||||||
| viii. | Wet Stir Mill System | xvi. | Waste Tire Recycling System | |||||||
Turbo Mill Features:




Turbo Mill Introduction and Working Principle:
As already shown in the name of this mill the principle of grinding is the impact force. The Turbo Whirl Mill is
an ideal combination of impact and fluidized bed mill for grinding, homogenisation, deagglomeration and coating.
Thanks to ttheir screw-less fixing, the beaters can be replaced quickly and easily. the rotor's beater equipment
can be flexibly modified with regard to the relevant grinding and product demands. The possibility to operate
the beater in both clockwise and counter clockwise direction increases the beater's lifetime.





1) What are our main products?
- We design and manufacture various powder grinding mills, classifiers, coating machines, mixing machines, etc.
2) What service do we supply?
- We offer consultancy for project feasibility assessment, process flow definition, preliminary layout and factory building plan, project budget, project time schedule, etc.
- We supply sample processing tests in our test station where are equipped with our various machine products, to help clients compare performances of different types of machines or process.
- We supply project engineering, automation engineering and civil engineering.
- We send engineers to the clients’ project site and offer on-site technical instruction and supervision during the machine installation, commissioning and test run.
3) How long time is our delivery?
- 60 to 90 days after the down payment received.
4) What payment terms do we offer?
- 30% by T/T as down payment;
- 70% by T/T before shipment or irrevocable L/C at sight.
5) What kind of shipment can we do?
- For complete machines, standard containers or frame containers by sea.
- For spare parts, wooden Case and pallet for delivery by air.
6) What service can we supply for machine installation and test run?
- We send engineers to the clients’ project site and offer on-site technical instruction and supervision during the machine installation, commissioning and test run.
7) What is our warranty policy?
- We offer warranty of 12 months after installation or 18 months after the delivery.
- We offer lifetime service for our machine products after the delivery, and will follow up the machine status with our clients after the successful machine installation in our clients’ factories.
For details, please contact our project consultants, thank you.

New products from manufacturers at wholesale prices