Tiger Rig Hot New Products ZP495 Rotary Table for Drilling Rig

Share on (60698935549):


Price:

Quantity:


Product Overview

Description


Tiger rig hot new products ZP495 rotary table


for drilling rig


 



Product description


Features


1.Split main bushing is steel cast.  Kelly drive and slip drive are available for choose.


2.Slip drive may locate in roller bushing of API standard Kelly or hexagonal Kelly, either long or short slip is usable.


3.Match with API standard casing bushing and special lifting tool


4.Efficient lubrication and reliable sealing.


 


 














































































Model



ZP175



ZP205



ZP275



ZP375



ZP495



Opening dia.
mm(in)



444.5
 (17 1/2)



520.7
(20 1/2)



698.5
 (27 1/2)



952.5
 (37 1/2)



1257.3
 (49 1/2)



Distance between rotary center and the teeth center of inner sprocket mm(in)



1118
(44)



1353
(53 1/4 )



1353
 (53 1/4 )



1353
(53 1/4 )



1651
(65)



Max. static load kN



1350



3150



4500



5850



7200



Max. working torque  Nm



14000



23000



28000



33000



37000



Max. speed  rpm



300



350



250



300



300



Gear ration



3.58



3.22



3.67



3.56



3.93



Dimensions
(L x W x H) mm



1935×1280


×585



2292×1475


×668



2392×1670


×685



2468×1810


×718



2940×2184


×813



Weight kg



3888



5530



6163



7548



11626



 


 


Payment term: T/T 30% as deposit


 


Trade term: EXW or FOB shanghai, CIF, DDU, CFR


 


Packing detail


Wooden cases


If there are plastic in it, steel frame will be packed outside


All of the productions are inspected carefully by QC before delivery.


 


Delivery time


1. Warehouse machine: 3 days after 100% payment.


2. booked machine: 15-30days after 30% payment.


 


Welcome oversea rig manufacturer to cooperate with us.


 





Product pictures


 


ZP375 (3)


CIMG4166.JPG


 


CIMG4181.JPG


 


CIMG4184.JPG


 


CIMG4190.JPG


 


DSC03064.JPG


 


 





Factory Strenth


 




1_01.jpg1_02.jpg2_01.jpg


 


 


 


 



Star Endorsement


 .jpg




 



Agent Want


 


Tiger Agent Requirements:


 1.Over 30 years old


 2.Having the capital background in the local place


 3.Having the working experience on the oilfield, such as oil technician, oil exploit, oil sales etc, and the one who has customer resources, is prior


 4.Working near the oil field, thus convenient to visit customers


 5.Capacity of English communication  




 


 



FAQ


 


 


1.How is your workflow?


We can confirm the specification and specification first, and then sign the sales contract and the drawings. Once the drawings are confirmed, we will take photos for you to confirm that the goods are new and in shipment before shipment. Please pay the balance before the machine leaves the factory, and then we will ship the machine to Shanghai.


 


2.How to deal with product quality problems?


We provide 24-hour online service, we give 24 hours online, skype: tiger-rig, urgent WeChat: drillingrig,if there is an agent or branch, please ask our branch for help, such as in Russia, the United States, Dubai, the manager will come to your company or serve you by mobile, if there are technical questions, we will provide 12 hours online answers at 8:30-12:00, 14:00-18:00.


  


3.Are you plant or trade company?


We are plant, our address is: No.726, xingcheng road, Xindu Town, Sichuan Province, China,610500.


 


4.How can I get the quotation?


Please send your machine old brand, model, specification (such as power, rope size), nameplate photo to us, if u have tender document, ples also send to us, usually, we need to work on it for 1-2 days.


 


5.What is our delivery time?


Some of shale shaker, drilling fluid centrifuge, mud cleaner, sand pump, mud agitator is in stock supply, delivery time is 1 days after you make online payment in Alibaba. Book solid control machine delivery time is :7-35 days.


 


6.What about your work process?


We can confirm the manual and specification first, and then sign sales contract sign the drawing, once confirm the drawing, the before delivery, we will take photo for you to confirm the goods are new and shipping station, before machine leave factory, ples pay remain payment, then we truck machine to shanghai.




 


 


 


0.195 s.