Right Angle IEC 320 C14 Male Plug to C13 Female Socket AC Power Cord Connector

Share on (60701473796):


Price:

Quantity:


Product Overview

Description


AC IEC 320 C14 Male Plug to C13 Female Socket AC Power Cord Connector

Product Description

 

Product Name IEC 320 C14 Male Plug to C13 Female Socket AC Power Cord Connector
Connector TypeIEC 320 C14 MALE to C13 FEMALE
RATED VOLTAGE125V~250V
RATED CURRENT10~16A
RATED POWER2500W
MaterialNYLON
ColorBlack
Detailed Images
IEC 320 C14 Male Plug to C13 Female Socket AC Power Cord ConnectorIEC 320 C14 Male Plug to C13 Female Socket AC Power Cord Connector

IEC 320 C14 Male Plug to C13 Female Socket AC Power Cord ConnectorAC 250V 10A IEC 320 C14 Male Plug to C13 Female Socket Power Connector

AC 250V 10A IEC 320 C14 Male Plug to C13 Female Socket Power ConnectorAC 250V 10A IEC 320 C14 Male Plug to C13 Female Socket Power Connector

 

 

Related Products
AC 250V 10A IEC 320 C14 Male Plug to C13 Female Socket Power Connector 
Packaging & Shipping
Shipping MethodsInt'l express, By Air, By Sea, By Train
Freight CostPrepaid or Collected by Customers
Delivery to Customer 4-5days after shipment
PackagingPE bag in carton or as customer's requests
Paper Carton size47*32*24cm
Our Services
MOQ500pcs or as its raw material complexity
Place of OriginShenzhen, Guangdong, China
Price termsEXW, DDU, FOB, CIF, DDP
Payment methodsPayPal, T/T, Western Union, 50% T/T in advance, balance before shipping. 
Delivery timeUsually 10-15 business days, On-time delivery
Sample timeWithin 5 business days.
SamplesUsually free of charge, charge cost as raw material complexity and samples quantity
Other serviceProduct sourcing, supplier sourcing

 

FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.


0.0916 s.