Vacuum Induction Melting Gas Atomization Furnace/Powder Atomizing Equipment

Share on (60702272223):


Price:RUB 15,688,240.00 - RUB 23,297,036.40

Quantity:


Product Overview

Description

Product Description

The vacuum gas atomization furnace is widely used for producing spherical metal powders such as Ni-based, Fe-based, Co-based, stainless steel, etc alloy powders. 

The metal & metal alloy are melted under vacuum conditions with protective gas. The metal liquid flows through thermal insulating crucible and diversion tube to the atomizing chamber. Meanwhile, the liquid will be atomized & cracked into small droplets by high pressure air flow via tight coupling nozzle. The droplet will solidify into spherical or semi-spherical particles during falling down.

Product Name
gas atomization furnace
Processing Material
Ferrous metal & non-ferrous metal
Color
blue or customized
Standard
DIN ISO
Protective Grade
IP54
Scale
Industrial mass production 
Powder shape
spherical
Used
3d printing, spayer coating, anti-corrosion parts, welding
Products Show
Our Service
Pre-sales service

1. Patient contact with customer and know customer's real needs.

2. Provide technical & commercial proposal

After-sales service

1. Engineers are able to serve overseas

2. Long-life technical consultancy

Our Company

Factory

Our Factory

Workshop

Our Workshop

Small meeting room

Our meeting room

Team

Our Team

Packing & Delivery

Packing Details : standard sea-worthy package

Delivery Details : 90-180days after receipt of down payment

Our Certifications

Advanced vacuum gas atomization technology

We can provide turn-key project according to customer ' s requirement.

Customer Photo







FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally 90days to 180days because all of our products are customized.

Q: Do you provide samples ? is it free or extra ?

A: No, but we provide customized service.

Q: What is your terms of payment ?

A: 30% down payment by T/T, 30% for progress payment by T/T, balance paid before delivery.

0.1866 s.