Share on (60705268261):
Disc is a new scaffolding, is the bowl button scaffolding after the upgrading of products. Also known as: chrysanthemum disc scaffolding system, plug scaffolding system, wheel scaffolding system, buckle plate scaffolding, layher frame, (layher scaffolding, Layher frame, because the basic principle of the scaffolding by the German LAYHER ) The invention of the company, also known as the "Layher frame." Mainly used for large-scale concert light frame, background frame.) This scaffolding socket for the diameter of 133mm, 10mm thick disc, the disc opened 8 Hole, the use of φ48 * 3.5mm, Q345B steel pipe as the main component, the pole is a certain length of the steel pipe every 0.50m welded on a disc, with this novel, beautiful disc connection bar, the bottom with a connection The The cross bar is made of a plug with a bolt at both ends of the pipe.
Feature
1). Multi-function
2). Low structure
3). The product has a high degree of economy, the use of more convenient and faster
4). Carrying capacity
5). Safe and reliable
6). Comprehensive benefits are good
7). Install the bar connector only at the chrysanthemum disk position, and then manually insert the plug into the chrysanthemum disk hole and pierce the bottom of the joint, and then hit the top of the plug with a hand hammer, so that the cross bar on the circular surface And close together with the pole.
Ringlock scaffolding system easy assembly.
Round steel pipe Verticals Ledgers Diagonal brace
Rosette Diagonal brace head Ledger head Wedge pin
Screw jack with base head Scaffolding catwalk with hooks steel stair screw jack with U head
Ringlock scaffolding packing in bundle.
Xianning City Topway Metal Products Co., Ltd factory is in Tianjin China, more than ten years experience, with advanced production equipment and experienced operator, make sure the quality is guaranteed! also products can accept all kindly test.
Xianning City Topway Metal Products Co., Ltd office is in Xianning city, Hubei province, China, with professinal sale terms, can provide all customers all kinds scaffolding related products consulting and after-sales service, our goal is make the one-stop purchasing on scaffolding products.
You can get following on Topway
1. one-stop purchasing of related scaffolding products from Topway Metal
2. Related scaffolding including: scaffolding system (ringlock scaffolding system, movable scaffolding system, steel tube and scaffolding clamp, formwork system )
3. Lead time is 20-30 days for all products
4. delivery on time
5. Reply your inquiry within 24 hours
6. delivery to you by LCL or FCL, and price items can offer EXW, FOB, CNF, CIF as you wish.
7. Customized the special size for you
1, which steel pipe is not allowed to use scaffolding erection
A: Corrosion serious, flattened, curved, cracked steel pipe.
2, which fasteners are not used
A: Where there are cracks, deformation, shrink loose, slip wire are not allowed to use.
3, door scaffolding erection height generally should not exceed the number of meters
A: not more than 5 meters.
4, scaffolding pole top should be much higher than the roof
A: The top of the pole should be higher than the daughter wall epithelium lm, higher than the cornice epithelium 1.5m.
5, steel, bamboo mixed with scaffolding is available why
A: The basic requirements of the scaffolding is the overall force, not shaking, no deformation, to maintain stability. Rod node is the key to force, and mashup scaffolding, no reliable lashing material, resulting in node relaxation, Experience deformation, can not meet the foot of the force requirements.
6, scaffolding and its foundation in which stages should be checked and accepted
(1) after the completion of the foundation and scaffolding; (2) After freezing; (3) each set up after 10 to 13m height; (4) in case of six strong winds and heavy rain, the cold area to open (5) to reach the design height; (6) disabled for more than a month.
7, scaffolding during use, it is strictly prohibited which parts removed
A: (1) the main node at the horizontal horizontal horizontal bar, vertical and horizontal sweeping pole; (2) with wall pieces.
8, "construction of the door-type steel pipe scaffold safety technical specifications" on the door-type steel pipe scissors set what the requirements
A: (1) scaffolding height of more than 20m, should be set in the scaffolding outside the continuous; (2) scissors diagonal and the ground tilt angle should be 45 degrees a 60 degrees, scissors width should be 4-8m; (4) scissors diagonal bar if the use of lap joint length, lap length should not be less than 600mm, lap joints should be used two fastener fastening.
9, door scaffolding erection of the scaffolding in the overall vertical and horizontal degree deviation requirements
A: The verticality allows the deviation of the scaffolding height of 1/600 and ± 50mm; level tolerance for the scaffolding length of 1/600 and ± 50mm.
10, on the masonry frame and decorative rack load is how to request
A: Masonry frame load should not exceed 270 kg / square meter, decorative scaffolding should not exceed 200 kg / square meter.
New products from manufacturers at wholesale prices