Share on (60714604911):
| PRODUCT NAME | CBM-900 PP Woven Filling Bag Making Machine |
| USAGE | Suit for make filling bag for cement,feed,powder package.etc |
| SUITABLE MATERIAL | None Lamiation PP Woven Bag ,Laminated PP Woven Bag.Paper Lamination PP Woven Bag.Paper Bag. (Note:Can't suit for material with indepent inner plastic bag) |





Machine adopt vaccum chuck to open bag ,then folding device to fold filling mouth, can fold filling mouth for 3 pieces bag in one time. It's the fastest equippment in currently market.Can save many labor cost.


With automatic qualified checking unit ,can sending disqualified bag away.Make sure there won't have material waste.

Machine have top & buttom edge paper cover inserting function. After inserting ,sewing machine will sewing the top & buttom edge ,then auto cutting the sewing thread.

Collecting adopt rotary collecting device and with number counting,make collecting in smooth flat.
Machine Electronic Components & Motors Are From International Famous Brand




| Model | CBM-900 |
| Min.Material Width | 380mm |
| Max.Material Width | 440mm |
| Min.Material Length | 780mm |
| Max.Material Length | 900mm |
| Bag Making Speed | 38-48Pcs/Min(Depend on worker feeding speed) |
| Installation Power | 11KW |
| Working Power | 7KW |
| Machine Demension(mm) | L9800×W1620×H1450 |
| Machine Weight(mm) | 2200Kgs |





*This machine need one 40'' container to load
*All driving part of machine will making lubrication
*Machine outside will be covering with water proof film
CE Certificate







Warranty
* 1 year warranty
* Any part of electronic ,if it's not cause by man-made reasons,we will ship you a free new one.
* If beyond warranty,we offer free repair service,Clients need undertake ship cost
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
*In Vietnam,Malaysia.Philippines.Indonesia. We have local engineer ,but client please undertake travelling expenses for them.
A: We are factory. We have engineer in Vietnam, Indonesia ,Malaysia&Philippines.
A: Generally it is 30-40 days after getting deposit.
New products from manufacturers at wholesale prices